Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Action ItemsDue DateAssigned Persons
  •  Make Task List
11/12/22Jake/Alex/Nate/Grace
  •  Assign Roles
11/15/22
  •  Make Timelines
11/15/22Jake/Alex
  •  FDR
11/22/22Divide work?
  •  Finalize CAD Drawings
11/19/22Mike?
  •  Create Engineering Drawings
11/22/22Mike?
  •  Make COTS Parts list + Order
11/22/22Jake/Alex/Nate


Manufacturing TasksProcessAssigned PersonsPriority
  •  3 Fiber Glass Body Tubes
      •  CAD
      •  Engineering Drawings
      •  Wind Tubes
      •  Post-process
        • sanding, paint, holes
      •  Test
      •  Integrate into Rocket
Winding1
  •  1 Carbon Fiber Booster Tube
      •  CAD
      •  Engineering Drawings
      •  Wind Tubes
      •  Post-process
        • sanding, paint, holes
      •  Test
      •  Integrate into Rocket / coupler
Winding2
  •  4 Aluminum Bulkheads
      •  Add holes to CAD
      •  FEA
      •  Drawing
      •  Stock: Aluminum in basement
      •  Tool Path
      •  Tormach/cleanup
      •  Secured by Rocket Epoxy

Mill

4
  •  3 FG Centering Rings
    CNC
        •  CAD 
        •  Drawings
        •  Stock: FG Sheet (may need diff. material)
        •  Construct Router - Ask Mike (maybe water jet)
        •  Integrate using rocket epoxy to CF Tube
    Mill7
    •  Fins (including fin slots)
        •  Calculations
        •  CAD
        •  Drawings
        •  Stock (CF Sheets)
        •  Manufacture on router (Ask Mike) (water jet?)
        •  Integrate
      Mill+
            • 3D print internal jig
            • rocket epoxy fin to tube with jig in
      Mill6
      •  Tip to tip layup (3-5 layers)
        Work with Formula to use oven
            •  Lay-up 4 layers of CF rotating weave 45 deg. each layer
            •  apply to rocket - overlap over edge of wing

        6
        •  Aluminum Tip
        CNCExterior - Lathe
            •  CAD - need thread and washer to secure
            •  tool path
            •  Lathe
            •  Cleanup
            •  Integrate
        Lathe3
        •  FG Nose Cone 
            •  Calculations
            •  CAD/Mold
            •  Engineering Drawings
            •  Mold
              • Stock MDF
              • Cut on the router
              • sand
              • gray
              • sand
            •  Stock: Aluminum
            •  Cut stock
            •  layup
            •  post-process 
              • sanding
        FG Lay-up
        •  Aluminum Motor Casing
        3
        •  Rail Guides
            •  CAD
            •  Buy
            •  Integrate
              • Connect to CF tubes with Nuts and Bolts
        Buy9
        •  Boat Tail
            •  CAD
            •  send to Matt
            •  Get from Matt
            •  Bolted to Aft bulkhead
        Matt8
        •  Thrust Plate
            •  CAD 
            •  Drawing
            •  Stock - Aluminum
            •  tool path
            •  tormach/ cleanup
            •  rocket epoxy to CF tube
        Mill5

        Parts to Buy:

        • 2 FG Coupler Tubes
        • Rail Guides
        • Child pages (Children Display)