Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
  • Work session Saturday
  • Finished layout in ave bay
  • CAD antenna mounts
  • Mount Scrap and all other components with stand offs/other stuff done by this weekend Riley/Hayden
  • Laser cut walls decide the material of walls (acrylic or fiberglass) 
  • Batter mount Hayden
  • Make sure we have access to screw switches Hayden

    • Battery mount
    • Heat sinks in flight computer mount
    • scrap design finished need to put hardware in
    •  Finish CAD

     
    •  Bushing holes for press fit Grace
    •  Double check airbrake design and fitting Grace
    •  Fix motor to mid plate (hole in front of the motor) Grace
    •  Weights Grace/Riley
    •  Printed airbake to make sure it works
    •  Motor CAD
    •  Order hardware Grace/Louis
    •  order send cut send parts and material for us to mill leaves Grace
    •  Update airbrake spacer Grace
    •  Servo wiring 4 holes Hayden
    •  Loadcell/servo holes Hayden
    •  Flip servo so it moves with airbrake and make hole bigger Grace
    •  Make leaf floating .5mm Grace
    •  What to make and not to make Grace
    •  Stock in basement Grace
    •  order load cells Louis
     
    Look over Airbrake CAD Jonah





    • Working of FEA
    • Split the recovery bay box into walls  Hayden
    • Look into chute size to make sure it will fit it FITS!
    • Spec chute bag
    • CFD for drag coefficient/load of the airbrakes 
    •  FEA on snatch force check Leo/Jonah
    •  Wire holes in recovery bay Hayden
    •  Look into making our own chute bag Jonah/Louis/Leo
    •  Look into reefing Leo


    • Made chute bag 2.0
    • Double checked FEA
    •  Test chute bag
    •  Test reefing

    •  Keep BOM up to date
  • Load cell ordered
  • COTs flight computer ordered
    • Order batteries Louis
    • Antennas Louis
    • Connectors from scrap to computers (JST 2mm pig tail) Louis
    • Order Screw Switches (buy from Florida) Louis
    Blocked by size order Louis




    •  Continue working on SCRAP
    •  Done with schematic
    • scrap done!
  • Have avionics team check schematic/layout of scrap Jim
  • Edit from feedback Jim
  • Final battery check Jim
  • Waiting on airbrake to be manufactured


    Other