  • When the tank arrives at the site it is secured with ratchet straps to (IDK, what can we get in the field that could restrain a tank properly

  • A regulator is attached to the tank

    • Correct pressure rating

    • Correct gas type(ie. don't use a hydrogen regulator with helium)

    • Undamaged threads on both side

  • The helium tube is run to the launch tarp

    • Ensure not a tripping hazard, don't let the tube hang. Have it run along the ground

  • Turn the valve of the tank on

    • Turn it slowly

    • Turn it all the way on

Site Prep

  • Site requirmentsrequirements

    • The launch site needs sufficient open area down wind to clear the tree line

    • The launch site needs to have sufficient distance from inhabited areas that in the first 1000ft of accent the balloon does not pass over a dwelling

...

  • Sondes cases have had NWS stickers removed

  • Sondes are powered on using fresh energizer ultimate lithium AA out of the pack

  • Sondes are checked to have lock and be decoding on ground station laptop

Line prep

  • Tie line items to the line/inline

  • Ensure the line items are attached in the correct order

  • Double check knots

  • Check all carabiners are taped shut

...