Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Please update these with more detains details of EVERYTHING that has to be done even the smallest thing add as a bullet to check off! Assign tasks and DRI's. The DRI's are responsible for completion not all of the hands-on work that comes from the team as a whole. 


Structures

Nose Cone

TaskAssigned Comments/Progress/Blockers
  •  CAD
  •  Identify each component and confirm their accuracy 
  •  Add material properties
  •  CAD
  •  Model the polycarbonate
  •  Ensure everything fits together
  •  Order
  •  Nose cone already ordered?
  •  Assemble (epoxy to bulkhead)

What is the progress of this bulkhead it is attached to?


Airframe

TaskAssigned Comments/Progress/Blockers
  •  CAD
Nathan Lloyd
  •  CAD
Nathan LloydBlue Tube Lengths 
  •  Order

  •  Cut

Bulkheads x 4 Plywood5 Aluminum

TaskAssigned Comments/Progress/Blockers
  •  CAD
  •  Camera bay
  •  Parachute
  •  3 air brakes 
  •  FEA

  •  Order/find stock (plywood)
Nate Lloyd (RIT Student) plywood is done at the moment, aluminium needs to be finished in CAD
  •  Manufacture (router)


  •  Assemble/ Epoxy to tube


Chute Bulkhead

TaskAssigned Comments/Progress/Blockers
  •  CAD
just need the eye bolt holes, and need to pick an eye bolt.
  •  FEA of Bulkhead

  •  FEA of Ibolts

checking McMaster-carr

the one in fusion is probably too small and should be upped to maybe 1/2" diameter

  •  Order/find stock (1/2 aluminum)
Thickness of 1/2 over kill? answer it is it has been reduced in the cad
  •  Manufacture (CAM)


  •  Manufacture (tormach)


  •  Assemble/ Epoxy to tube


Camera Bulkhead

TaskAssigned Comments/Progress/Blockers
  •  CAD

  •  FEA of Bulkhead

  •  Order/find stock (1/2 aluminum)
Thickness of 1/2 over kill?
  •  Manufacture (CAM)

  •  Manufacture (tormach)

  •  Mount Camera to bulkhead

  •  Assemble/ Epoxy to tube

Fins

TaskAssigned Comments/Progress/Blockers
  •  CAD


  •  Calcs (fin flutter) 
Louis Fleisher (RIT Student) double check these calcs
  •  Order/find stock (Fiber Glass)
Get quote from Send cut send instead of make in house
  •  Manufacture (CAM)
Nate Lloyd (RIT Student) Send cut send instead of make in house
  •  Manufacture (crushinator or router)
Send cut send instead of make
Nate Lloyd (RIT Student) making in house
  •  Manufacture slots in airframe tube


  •  Jig to make slots in airframe 


  •  Epoxy fins into slots


Motor (thrust plate/motor retainer/motor tube)

TaskAssigned Comments/Progress/Blockers
  •  CAD
  •  Put into Assembly
Nate Lloyd (RIT Student) 
  •  Calcs 
  •  FEA on PLates
Nate Lloyd (RIT Student) 
  •  Order/find stock (Aluminum) 
  •  Stock
  •  Hardware
  •  motor
Nate Lloyd (RIT Student) 
  •  Manufacture 
  •  Thrust plate 
  •  Motor retainer
  •  Motor tube
  •  Find Motor Tube Weight 
Nate Lloyd (RIT Student) Get Motor Tube Weight
  •  Assembly
  •  Bolt together
  •  Order TBD
Nate Lloyd (RIT Student) 




Airbrakes

TaskAssigned Comments/Progress/Blockers
  •  CAD/Assembly 
  •  Pick L brakets and order/test

  •  FEA of ASSy

  •  FEA of joints

  •  Motor Selection from Calcs

  •  Snatch force calculation

  •  Airbrake equivalent of chute math

  •  Order/Find Materials
  •  BOM
Ready to order L brackets (x10)
  •  Manufacture
  •  Stock
  •  Rods/long screw
  •  Aluminum
  •  Blue tube
  •  Hardware


  •  Assemble
  •  Integreate with Rocket
  •  Internal assembly
  •  Add action items as CAD is finished



Engineering Camera

TaskAssigned Comments/Progress/Blockers
  •  CAD/integrate with Rocket assembly

  •  Order 
  •  Camera
  •  Electronics
  •  ect from BOM
Remember to order press fittings
  •  Manufacture
  •  
Create Jig to make slots/hole
  • Cut slots in airframe
  •  Cut slots in
airframe
  • acrylic coupler
  •  3D print Jig
  •  Hole in air frame for screw switch
  •  3D print casing 
  •   

3D print the mounts before cutting the tube to ensure fit

  •  Assemble
  •  Integrate with Rods
  •  Epoxy to airframe
  •  Wire/connect 

Scenic Camera

TaskAssigned Comments/Progress/Blockers
  •  CAD/integrate with Rocket assembly
  •  Bolt to make camera removable idea

  •  Order 
  •  Camera
  •  Electronics
  •  ect from BOM

  •  Manufacture
  •  Lathe acrylic tube 
  •  Aluminum stock?
  •  Steel Stock?

Add what has to happen to be manufactured don't have in notes


Acrylic coupler should be 4 inches on each side

  •  Assemble
  •  Bolts 
  •  Integration to airframe TBD


Avionics

TaskAssigned Comments/Progress/Blockers
  •  CAD/integrate with Rocket assembly
  •  Component selection
  •  Wire diagram
  •  New wire diagram for the Arduino
    •  Meet with avionics to discuss feasibility 
Order 
  •  board

Avionics has approved plans to use Arduino. Finish AV bay(battery clips, boards, batteries). CAD DC Motor and motor retainer. Need to figure out how motor integrates with air break. 
  •  Print 3D components

  •  Figure out how to program the Arduino to accept PWM, and repeat the signal
    •  Detecting PWM
    •  Outputting PWM
    •  Running timed loop for PWM output
  •  Testing and Validation
Aaron Chan (RIT Student) Test full airbrake deployment as well as black powder charge triggering. 
  •  Order 
  •  boards(proton & arduino)
  •  motor
  •  gps
  •  Explore other options
BLOCKER due to low inventory explore other options
    •  Reach out to Eggtimer for update on boards (2/18)

New wiring diagram approved. Check is everything ordered, even protons. 

  •  Manufacture
  •  Laser cut plywood (1/8th)
  •  Set screw in square rod hole

  •  Assemble
  •  Glue together
  •  slide into rocket