Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.



Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
  • Work session Saturday
  • Finished layout in ave bay
  • CAD antenna mounts
  • Mount Scrap and all other components with stand offs/other stuff done by this weekend Riley/Hayden
  • Laser cut walls decide the material of walls (acrylic or fiberglass) 
  • Make sure we have access to screw switches Hayden

  • Battery mount
  • Heat sinks in flight computer mount
  • scrap design finished need to put hardware in
  •  Finish CAD

  •  Bushing holes for press fit Grace
  •  Double check airbrake design and fitting Grace
 Fix motor to mid plate (hole in front of the motor
Grace
  •  Weights Grace/Riley
  •  Printed airbake to make sure it works
  •  Motor CAD
  •  Order hardware Grace/Louis
  •  order send cut send parts and material for us to mill leaves Grace
 
What to make and not to make Grace
  •  Stock in basement Grace
  •  order load cells Louis
  •  Look over Airbrake CAD Jonah





  • Working of FEA
  • Split the recovery bay box into walls  Hayden
  • Look into chute size to make sure it will fit it FITS!
  • Spec chute bag
  • CFD for drag coefficient/load of the airbrakes 
  •  FEA on snatch force check Leo/Jonah
  •  Wire holes in recovery bay Hayden
  •  Look into making our own chute bag Jonah/Louis/Leo
  •  Look into reefing Leo


  • Made chute bag 2.0
  • Double checked FEA
  •  Test chute bag
  •  Test reefing

  •  Keep BOM up to date
  • Load cell ordered
  • COTs flight computer ordered
  • Order batteries Louis
  • Antennas Louis
  • Connectors from scrap to computers (JST 2mm pig tail) Louis
  • Order Screw Switches (buy from Florida) Louis
Blocked by size order Louis




  •  Continue working on SCRAP
  •  Done with schematic
  • scrap done!
  • Have avionics team check schematic/layout of scrap Jim
  • Edit from feedback Jim
  • Final battery check Jim
  • Waiting on airbrake to be manufactured


    Other