Team Members:
- Jake Halpern
- Alex Speyer
- Nate Aquilio
- Brahm Soltes
- Tomasz Mazur
- Kenny Kim
- Alex Durand
- Mike Elrod
- Ryan Cross
...
- Make Task List
...
- Assign Roles
...
- Make Timelines
...
- FDR
...
- Finalize CAD Drawings
...
- Create Engineering Drawings
...
- Make COTS Parts list + Order
...
- 3 Fiber Glass Body Tubes
- CAD
- Engineering Drawings
- Wind Tubes
- Post-process
- sanding, paint, holes
- Test
- Integrate into Rocket
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
- 1 Carbon Fiber Booster Tube
- CAD
- Engineering Drawings
- Wind Tubes
- Post-process
- sanding, paint, holes
- Test
- Integrate into Rocket / coupler
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
- 4 Aluminum Bulkheads
- Add holes to CAD
- FEA
- Drawing
- Stock: Aluminum in basement
- Tool Path
- Tormach/cleanup
- Secured by Rocket Epoxy
...
Mill
CAD/ Drawings - Michael Elrod (RIT Student)
...
- 3 FG Centering Rings
- CAD
- Drawings
- Stock: FG Sheet (may need diff. material)
- Construct Router - Ask Mike (maybe water jet)
- Integrate using rocket epoxy to CF Tube
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
- Fins (including fin slots)
- Calculations
- CAD
- Drawings
- Stock (CF Sheets)
- Manufacture on router (Ask Mike) (water jet?)
- Integrate
- 3D print internal jig
- rocket epoxy fin to tube with jig in
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
- Tip to tip layup (3-5 layers)
- Lay-up 4 layers of CF rotating weave 45 deg. each layer
- apply to rocket - overlap over edge of wing
...
...
- Aluminum Tip
- CAD - need thread and washer to secure
- tool path
- Lathe
- Cleanup
- Integrate
...
...
- FG Nose Cone
- Calculations
- CAD/Mold
- Engineering Drawings
- Mold
- Stock MDF
- Cut on the router
- sand
- gray
- sand
- Stock: Aluminum
- Cut stock
- layup
- post-process
- sanding
...
...
- Rail Guides
- CAD
- Buy
- Integrate
- Connect to CF tubes with Nuts and Bolts
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
- Boat Tail
- CAD
- send to Matt
- Get from Matt
- Bolted to Aft bulkhead
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
- Thrust Plate
- CAD
- Drawing
- Stock - Aluminum
- tool path
- tormach/ cleanup
- rocket epoxy to CF tube
...
CAD/ Drawings - Michael Elrod (RIT Student)
...
Parts to Buy:
- 2 FG Coupler Tubes
- Rail Guides
Fiber Glass Body Tube Winding:
Setup -
Winding -
Removal -
Child pages (Children Display)children | ||
---|---|---|
|