Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
---|
|
- Work session Saturday
- Finished layout in ave bay
- CAD antenna mounts
| Mount Scrap and all other components with stand offs/other stuff done by this weekend Riley/HaydenLaser cut walls decide the material of walls (acrylic or fiberglass) Batter mount HaydenMake sure we have access to screw switches Hayden- Battery mount
- Heat sinks in flight computer mount
- scrap design finished need to put hardware in
| |
|
|
- Bushing holes for press fit Grace
- Double check airbrake design and fitting Grace
- Fix motor to mid plate (hole in front of the motor) Grace
- Weights Grace/Riley
- Printed airbake to make sure it works
- Motor CAD
| - Order hardware Grace/Louis
- order send cut send parts and material for us to mill leaves Grace
- Update airbrake spacer Grace
- Servo wiring 4 holes Hayden
- Loadcell/servo holes Hayden
- Flip servo so it moves with airbrake and make hole bigger Grace
- Make leaf floating .5mm Grace
- What to make and not to make Grace
Look over Airbrake CAD Jonah- Working of FEA
- Split the recovery bay box into walls Hayden
- Look into chute size to make sure it will fit it FITS!
- Spec chute bag
- CFD for drag coefficient/load of the airbrakes
- FEA on snatch force check Leo/Jonah
- Wire holes in recovery bay Hayden
- Look into making our own chute bag Jonah/Louis/Leo
- Look into reefing Leo
| - Made chute bag 2.0
- Double checked FEA
| - Test chute bag
- Test reefing
|
|
| |
Load cell orderedCOTs flight computer ordered- Order batteries Louis
- Antennas Louis
- Connectors from scrap to computers (JST 2mm pig tail) Louis
- Order Screw Switches (buy from Florida) Louis
| Blocked by size | order Louis
|
|
|
| - Continue working on SCRAP
- Done with schematic
| |
Have avionics team check schematic/layout of scrap JimEdit from feedback JimFinal battery check JimWaiting on airbrake to be manufactured |
|
Other |
|
|
|
|