Please update these with more details of EVERYTHING that has to be done even the smallest thing add as a bullet to check off! Assign tasks and DRI's. The DRI's are responsible for completion not all of the hands-on work that comes from the team as a whole.
Structures
Nose Cone
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
|
| |
| Nathan Lloyd |
|
|
| |
| What is the progress of this bulkhead it is attached to? |
Airframe
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| Nathan Lloyd | |
| Nathan Lloyd | Blue Tube Lengths |
| ||
| Nathan Lloyd |
Bulkheads x 5 Aluminum
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
|
| |
| ||
| Nate Lloyd (RIT Student) | plywood is done at the moment, aluminium needs to be finished in CAD |
| ||
|
Chute Bulkhead
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| just need the eye bolt holes, and need to pick an eye bolt. | |
| ||
| checking McMaster-carr the one in fusion is probably too small and should be upped to maybe 1/2" diameter | |
| Thickness of 1/2 over kill? answer it is it has been reduced in the cad | |
| ||
| ||
|
Camera Bulkhead
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| ||
| ||
| Thickness of 1/2 over kill? | |
| ||
| ||
| ||
|
Fins
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| ||
| Louis Fleisher (RIT Student) | double check these calcs |
| Get quote from Send cut send instead of make in house | |
| Nate Lloyd (RIT Student) | Send cut send instead of make in house |
| Nate Lloyd (RIT Student) | making in house |
| ||
| ||
|
Motor (thrust plate/motor retainer/motor tube)
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| Nate Lloyd (RIT Student) | |
| Nate Lloyd (RIT Student) | |
| Nate Lloyd (RIT Student) | |
| Nate Lloyd (RIT Student) | Get Motor Tube Weight |
| Nate Lloyd (RIT Student) |
Airbrakes
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| ||
| ||
| ||
| ||
| ||
| ||
| Ready to order L brackets (x10) | |
| ||
|
Engineering Camera
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| ||
| Remember to order press fittings | |
| 3D print the mounts before cutting the tube to ensure fit | |
|
Scenic Camera
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| ||
| ||
| Add what has to happen to be manufactured don't have in notes Acrylic coupler should be 4 inches on each side | |
|
Avionics
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
| Avionics has approved plans to use Arduino. Finish AV bay(battery clips, boards, batteries). CAD DC Motor and motor retainer. Need to figure out how motor integrates with air break. | |
| ||
| Aaron Chan (RIT Student) | Test full airbrake deployment as well as black powder charge triggering. |
| New wiring diagram approved. Check is everything ordered, even protons. | |
| ||
|