SubteamBreak Action Item ProgressPlan for rest of breakOther Action Items
Structures


Analysis
  • RASAERO model - talk to Alex
  • Tensile testing doc finished
  • FEA boat tail being worked
    • set up meeting with Alex next week
  • Bulkhead FEA - need wire size Aaron Chan (RIT Student) 
  • Start writing tech paper blurbs
Reaction Wheel
  • Made shielding between magnetic sensor and encoder
  • redesigned base and shell
  • Figure out test bed rocket
  • put control code into desktop demo
  • keep things simple in the test bed rocket model - keep things moving forward
Avionics
  • started wiring
  • looking into viable connectors
  • Looking at IREC REQ and DTEG - min dia is 22 gauge
  • stick to acidoplastic (delrin / HDPE) - looking for more cost-effective
  • need length of wiring to TD-2
  • CAD for Av bay done 
  • look into 1/4 inch delrin from basement
  • look at basement delrin
Payload

Backplane
  • Finished WIZNET schematics
  • Radio board and power board schematics almost done
  • LED blinking
  • Who will be main backplane lead at RIT 
  • testing SPI flash and BMP390 
  • reviewed code for ADXL 
  • add breakouts to BOM
  • make new schedule - firm - assign tasks
Recovery


Other
  • Finished final report and invoice for NYSG
  • Continue work on sponsorships