IREC Design Review SOP

Room preparation

  • Make sure you know the room’s AV setup

    • Is there a standing mic?

    • Is it working/any good?

    • Is there a camera?

  • Reserve 30 min early (if feasible) to set up

Zoom setup

  • Test mic and camera

    • Get Launch’s conference mic (puck) if needed

  • Designate Zoom handler

    • Use Zoom’s Q&A feature to organize questions and responses

    • Repeat room questions to Zoom before presenter answers

    • Read Zoom questions after room questions to room

    • Not SME

Dumb things we forget sometimes

Use this as a checklist while reviewing the slides. Feel free to expand.

Structures

  • Avionics interface

    • Space allocation

    • Holes for arming & venting

    • Alignment geometry

  • Payload interface

    • Space allocation 

    • Holes for arming & venting (if applicable)

    • Alignment geometry

  • Tube and joint specifications

    • Epoxy joint (coupler epoxied to which of two tubes?)

    • Metal screw joint (not separated in flight)

    • Shear pin joint (separated in flight)

    • Radio transparent y/n

Payload

  • Wiring diagrams

  • Connection method (connector model, crimped or soldered, etc.) for every connection in a wiring diagram

  • Power drain timeline

  • Data capture timeline

Deployed payload (same as Avionics COTS requirements)

  • COTS flight computer selection

  • GPS tracker selection

    • Range estimate

  • Recovery wiring diagram

    • GPS power

    • Altimeter power

    • Dual-event dual-redundant altimeter & charge wiring

  • Vent hole sizing determination

  • Arming holes & alignment method

Avionics

  • COTS flight computer selection

  • GPS tracker selection

    • Range estimate

  • Recovery wiring diagram

    • GPS power

    • Altimeter power

    • Dual-event dual-redundant altimeter & charge wiring

  • Connection method (connector model, crimped or soldered, etc.) for every connection in a wiring diagram

  • Power drain timeline

    • COTS flight computers

    • GPS tracker

All SRAD Electronics

  • Requirements

  • Components

  • Board-level block diagram

  • System-level wiring diagram

  • Flight state machine (+event detection schemes)

    • Failure risks in flight risk assessment (faulty event detection)

  • Data capture timeline & budget

  • Power drain timeline & budget

Recovery

  • Parachute & line diagram

  • Recovery deployment graphic

    • Shows what the rocket looks like going from not deployed to drogue to main

  • FoS table for recovery hardware

Add label