  • Structures

    • Requirements

      • Distinguish between should and shall with DTEG reqs

      • Consistency in dimensions (diameter, radius)

      • Use testing over analysis for FoS

    • OpenRocket

      • 10 mph wind case

      • Loki Research motor

      • Both satisfy rod speed req using base mass

    • Motor Selection

      • TWR calculated with ~28 kg mass

      • CTI issues (can be elaborated on later)

      • Is the Loki motor in stock? (need to check on that)

      • Need to do a more in-depth price comparison for jumping to N-class

      • Have we considered the M6000? (large overshoot)

      • Motor unreliability as we jump classes? (likely a non-issue, consult tech reports to confirm)

      • Loki motor burns blue, pretty cool

      • Prioritize off-rod velocity

      • Test parts to higher stresses if concerned with a more powerful motor

    • Nose Cone

      • Is the strength difference between CF and FG a valid concern?

      • What is the basis for saying CF is easier to remove from a mold than FG?

      • Are we considering different shapes at this stage?

        • Not considering other than a tangent ogive

        • Possibly look at Von Karman

      • Don’t worry about a tip for Mach reasons if under Mach 1

    • Body Tubes

      • Layup has less surface finish work than winding (except for seam line)

      • Layup strength comparison is dependent on the direction of fibers in purchased cloth

      • For winding where would we apply graphite powder?

      • Consider using the paint booth for heated cure cycle (look at temperatures needed and temperatures that can be achieved)

      • Winding pattern (current 60/30) though to change because of manufacturing process

      • Find out weight difference between layup and winding

      • Consider mechanical improvements to the X-Winder (in progress already)

      • FG frays far more during winding

      • Consider sourcing better FG tow

      • Prepreg FG tow?

      • How does cost per weight translate to cost per length unit of tube?

    • Bulkheads

      • Spar thicknesses vary a lot

      • Uniform spar thicknesses for testing and adding fillets to the thin membrane

      • Decrease overall bulkhead thickness (.5” to .375” or .25”)

      • Consider mounting space when looking at spar design

      • Why does the four-spar bulkhead maintain equivalent strength as a solid bulkhead with less mass?

        • Section moment considerations

    • Rail Buttons

      • SRAD

        • Why not machine plastic rail guides?

        • Aluminum rail button testing on L1s?

        • Plastic is actually easier to machine

        • Are these rail buttons better than COTS?

        • Not many teams use SRAD

        • Combo Al/Delrin rail buttons

      • COTS

    • Boat Tail

      • 3D Printing

        • Consider heat deflection temperature, not melting temperature

        • Glass Transition temp for PETG is around 80 degrees Celcius (per Deeb)

        • Consider simply using PETG again if using same or lower-thrust motor

          • Careful is going to Loki or higher

        • Consider layer height for printing

        • Worth testing layer height strength properties

      • Composite Layup

        • Is the compressive strength worth it here if using a fibrous material?

    • Fins

      • Numerical optimization for fins

      • Concern about lack of fin tabs if using tip-to-tip layup

    • Thrust Plate and Motor Retainer

      • The screw size restriction was due to the size of retainer

      • Think about screw on and one “locking” screw through both pieces

      • Slide 45: NO

    • Blockers

  • Avionics

    • Requirements

      • Minimize in-field assembly time by doing more before arriving at the VLA

    • Wiring Diagram

      • Add switches to GPS

      • Careful about where wires plug into

    • Backplane

    • Connectors

      • Move placement of connectors

      • Consider alternatives for bulkhead wire pass-throughs

    • Flight Computers

      • Why only RRC?

        • Because

    • Trackers

      • Featherweight ground station data can be sent to our ground station

      • Featherweight is more reliable

      • Cost of featherweight is comparable

      • Working ground station is good

      • Big Red Bee size is far larger

      • HORUS will not get drowned out

    • Live Video Transmission

      • HDMI connections can be somewhat unstable

        • Perhaps mitigate by using a small 3D print bracket

      • Drone cameras will likely be rated for higher G loads than the rocket will experience

      • Range ratings are likely unreliable and should be tested

      • RF transparent materials can still affect the signals

      • Live video challenge requires 1080p 30 FPS

      • Bad video is still worth something

      • Interference concerns with transmitting on crowded bands

        • Video transmitters can shift frequencies

        • Need to see if MCC approves that

      • Need to consider the drain timeline

      • Consider sending a turn-on signal to start the live video

        • It could also use boost detection

      • Really need to deep dive into how we can safely remotely turn it on without missing boost

    • Heat Management

      • EMI generation is likely a non-issue

      • Thermally conductive plastics

      • Turning on the runcams close to flight could negate the need for an airflow solution

      • External heat sink can cause more damage upon recovery

      • Test a large amount for fan system

      • Figure out activation issue before heat management to understand how much heat management is truly needed

      • EMI could also throw off magnetometers on non-flight critical components

    • Battery Chemistry

      • No individual lithium-ion cells

      • Look at batteries with leads rather than contacts

    • Engineering Cameras

      • LED is to help ease the exposure shock from brightness in NM

      • Come up with the number and location of modules

      • What view are we looking at for live video?

      • Need to have a large camera discussion with multiple subteams

  • Avionics Bay

    • Removeable Bulkhead

      • Inset Edge Circle contains the load and makes the connection weaker

      • Clover should not have a manufacturability issue

      • Add in a flat on the clover for keying

      • Clover design can only be epoxied on one side for fillets and the application must be careful to not impact the keying geometry

      • Consider how deep in the tube the clover is

      • Consider what tools can fit in to actually screw in the key

    • Material Selection for Skeleton

      • Waterjet isn’t as much of an issue this year

      • Check Metals Depot for Aluminum

    • Component Mounting

      • Label things

      • Removable top if implementing fixed sleds

    • General Improvements

  • Recovery

    • Requirements

      • Take care to follow the main altitude deployment DTEG

      • Give time for the main to inflate to meet the speed req

      • Consider how payload’s recovery system deploys

    • Streamer

      • Mitigate the length of the harness to reduce tangle risk

        • Dual Bay helps with this

      • Understand why we use a streamer instead of a chute for drogue

      • Consider Pilot Chutes

    • Main Chute

      • Find out and compare chutes based on descent rates

      • Decide on the correct size for the mass of our rocket (likely larger this year)

      • Vented chutes open far slower than non-vented

      • Put more thought into other factors surrounding descent rate decision

      • Consider Pilot Chutes

    • Links

      • May need to buy more quick links

      • Visual indicators for quick link tightness

    • Shock Cord

      • Maybe look into lower-rated shock cord

        • ESRA might want us to use 5000 lb for some reason

      • Ratchet Straps?

      • Cord Length needs to be figured out

      • Watch for corrosive BP protection

      • Consider how to secure the line protector

        • Sewing

      • Compare cut resistance of shock protector

      • Could attach COTS protection with heat shrink on either end

      • Reference OMEN Tech Report for Separation Shock Calculator

    • Foxhunt

      • Figure out where to place foxhunt beacons in the rocket

      • Look into other foxhunt beacon options

      • RS41 can possibly act as foxhunt beacon in AV bay

    • Test

      • HAB streamer tests?

    • Blockers

      • Consider Wildman Rocketry as a recovery component supplier

  • Payload

    • Requirements

      • Make sure payload can transmit without extended member

      • Recovery has not imposed any interface requirements

      • Sabot keying requirement

    • Extendable Antenna

      • Dust considerations hindering mechanical systems

      • Sheet metal manufacturing should be somewhat simple

      • Fishing line as an extendable string

      • Consider using the extension as a 2m antenna

    • Self-Righting Mechanism

      • Figure out what to do if it lands on the top or bottom

      • Round bottom and modify sabot

      • Is it worth the cost of a COTS emergency HAM inflatable antenna?

        • Too large of a package for the member

    • Frame Ideas

      • The Back Plate has more strength concerns due to larger moments

      • Stilt City - thanks yev

      • Offset parachute introduces more concentrated stresses and increases the possibility of shearing shroud lines due to contact with edges of the payload

    • Parachute Antenna

      • Mini Chutes

      • Crazy antennas are mitigated simply by another tracker

      • Extra parachute is a massive tangle risk

    • Battery Options

      • Use packages with leads not individual cells

      • Flat pack battery options

    • Cameras

      • Second lens on cam #2 has both analog and digital lenses

      • Also considering the same higher-end runcams as Avionics

    • Sabot

      • Change where the shock cord pass through is located

        • Does not fit into tube tightly as is

      • If implementing the band idea run it through both sides

    • SRAD PCB

      • Scope creep concerns

      • Most of this can be reused in terms of board design from previous boards

      • Figure out if the PCB provides power to servos as well as control

    • GPS Tracking

  • Finished

 

Related content

The Manhattan Project PDR Notes
The Manhattan Project PDR Notes
More like this
Improvements From Other Tech Reports
Improvements From Other Tech Reports
More like this
Structures To Do List:
Structures To Do List:
More like this
Boat Tails
More like this
2021-09-11 Meeting Notes - VOID
2021-09-11 Meeting Notes - VOID
More like this
References - Solid Propulsion
References - Solid Propulsion
More like this