SR2021 Team Triton Action Items

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

SR2021 Team Triton Action Items

Semester 2

Important Dates:

March 6-13 Spring Break

April 27 Final Exams Start

Assignee / Action Item / Description

Manufacturing Steps: 

Date Assigned:

Complete By:

Completion Date:

Comments:

Assignee / Action Item / Description

Manufacturing Steps: 

Date Assigned:

Complete By:

Completion Date:

Comments:

Assign tasks to people/groups. 

 

1/28/22

Ongoing 

Ongoing

We need to get groups working on specific action items. 

CAD Entire Rocket

 

1/29/22

ASAP

 

Teams need to work together to get this together.

Add and Highlight BOM Parts to Order

 

1/29/22

Ongoing

Ongoing 

Confirm parts with group, Domenic, and highlight 

We Need Money Guys. 

Search your couch cushions, sell your belongings, beg on the street.

1/29/22

Ongoing

Ongoing 

$$$$$$$. Don't sell your kidney. You might need that.

Avionics Bay Sled

Determine materials, Order materials, 3D print/laser cut, assemble/glue

1/24/22

3/5/22

 

Avionics group should finalize details and CAD soon. Make parts

Finalize Motor for Air brakes and order it

Re-simulate motor and selection 

1/24/22

2/05/22

 

 

Order Avionics

N/A

1/24/22

ASAP

 

Proton 2x, Batteries, transmitter etc. see BOM

Order & finalize parachute, eyebolts, shockcord, streamer

CAD, Calculate chute size, attach streamer

1/28/22

3/5/22

 

Structures team needs to figure out the parachute size needed and find a best fit for the rocket.

Solder Avionics boards

Very carefully solder connections to boards

1/28/22

3/5/22

 

BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!.....

Glue Black Powder Charges

Glue in position to successfully deploy parachute

1/28/22

End of Av Bay manufacturing

 

 

Wire avionics bay

Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges.

1/28/22

End of Av Bay Manufacturing

 

Do not directly connect source and ground. You will have a bad time.

Decide on how we are going to secure everything within the av bay.

Drill holes for Switches

(Potentially) Create jig for alignment.

1/28/22

After wiring/installation of parts

 

 

Order electronic parts for Air brakes

Get PWM module, DC Motor, Battery, flyback diode.

1/28/22

ASAP

 

 

Finalize materials needed for air break

Finalize parts list and stock. Put needed things in BOM

1/28/22

ASAP

 

 

Rods/ lead screws 

CAD, find what is needed ^

1/29/22 

CAD ASAP 

 

 

Motor attachment to air break

Figure it out, CAD, assembly/install^

1/29/22

CAD ASAP

 

 

Order materials for air break

N/A^

1/28/22

ASAP

 

Highlight the items

Manufacture air break 

CAD and Manufacture

1/28/22

CAD ASAP 3/20/22

 

Airbrake group is on this

Make and wire up black powder charges

We need to first determine the materials we need to make this.

1/28/22

Before we close up the rocket

 

We should find someone who knows how to do this. 

Get switch for avionics system

We also need to install it .

1/28/22

3/5/22

 

What switch is being used? 

Nose Cone

Make and glue bulkhead, order part

1/29/22

3/5/22

 

 

Four Plywood Bulkheads

CAD, order stock, cut, epoxy to tubes, FEA on top bulkhead

1/29/22

CAD ASAP

3/5/22

2/5/2022

 

 

Look into avionics alternatives

Substitute Eggtimer parts 

1/29/22

ASAP

 

 

Update wiring diagram 

N/A

1/29/22

ASAP

 

Update with new parts as needed

Airbreak Calculations 

FEA, Assembly, joints, snatch force

1/29/22

ASAP

 

 

Assemble "All or nothing" parachute system

 

1/29/22

3/5/22

 

 

Chute Bulkhead

CAD, FEA, I bolts, order stock, manufacture, epoxy to tubes

1/29/22

CAD ASAP

3/5/22

2/5/2022

 

Camera Bulkhead 

CAD, FEA, determine size, order stock, manufacture, mount camera

1/29/22

CAD ASAP 

3/5/22

 

 

Mount Camera to bulkhead 

^

1/29/22

3/5/22

 

 

Set Screw or L bracket into rods for AV Bay placement

Determine how its going to work, CAD, order parts, attach 

1/29/22

CAD ASAP

3/5/22

 

 

Make jig for air break?

 

1/29/22

 

 

 

Airbreak Webbing 

CAD, Order, "Gromit" it to airbreak 

1/29/22

 

 

Button head screw, "Gromit", Washers

CAD and print jig for cutting blue tube

 

1/29/22

ASAP

 

For airbreaks 

Figure out Airbrake Assembly order and integration

 

1/29/22

ASAP

 

 

CAD and 3D Print Engineering Camera Casing

CAD Integration and 3D print

1/29/22

CAD ASAP

3/5/22

 

 

Order parts for engineering camera

 

1/29/22

ASAP

 

 

Make jig and cut blue tube 

Cut blue tube for engineering camera

1/29/22

3/5/22

 

 

Manufacture Engineering Camera system 

Wire up, install, epoxy

1/29/22

3/5/22

 

 

CAD Scenic Camera 

CAD and integrate CAD into rocket

1/29/22

ASAP

 

 

Order parts for scenic camera

 

1/29/22

ASAP

 

 

Manufacture Parts for scenic camera

 

1/29/22

3/5/22

 

 

Assemble scenic camera

 

1/29/22

 

 

 

Fins CAD

Have CADed fins in model

1/29/22

CAD ASAP

 

 

Order stock and manufacture fins 

Send to "Send cut send" 

1/29/22

 

 

 

Attach Fins 

 

1/29/22

 

 

 

Calculations FEA for motor 

 

1/29/22

 

 

Done?

CAD/Assembly for Rocket Motor

 

1/29/22

CAD ASAP

 

Assembly for everything rocket motor

Manufacture thrust plate

Order stock and cut

1/29/22

3/5/22

 

 

Order stock for Rocket Motor

 

1/29/22

 

 

 

Set Up the Scenic Camera

No manufacturing

2/19/22

2/19/22

 

Donovan's gonna do it 

Have Fun 

idk 

-∞

Get to work