Action Items For Tuatara
Hey guys! This is what we discussed last week but it is not everything that will come up. Please add and check off tasks! Thanks! Wynter M. Petersen (RIT Student)
Logo | Assigned |
---|---|
Isaac Chin | |
Structures
Nose Cone
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| hardware? | |
Manufacture | ||
| ||
Assembly | ||
|
Airframe
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| ||
| ||
| ||
| hardware? | |
Manufacture | ||
| Bo Golden | probably drill |
| Bo Golden | |
| Bo Golden | |
Assembly | ||
|
Bulkheads x5
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| Joshua Rosenberg | |
| Leo Zheng | may not be needed but could be fun (bolts, motor attachments, blue tube) |
| hardware? | |
Manufacture | ||
| ||
| ||
Assembly | ||
| ||
|
Centering Rings x4
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| 1/8 in ply | |
Manufacture | ||
| Bo, Brooke, Joshua, Andrew L | Completed via laser cutter |
| ||
Assembly | ||
| ||
|
Smaller Centering Ring x2 (I forgot what you guys actually called this lol)
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| 1/8 in ply | |
Manufacture | ||
| Bo, Brooke, Joshua, Andrew L | Completed through laser cutter |
| ||
Assembly | ||
| ||
|
Metal Centering Ring x1
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| Blocked due to unknown number of Ibolts | |
| Decide the number of Ibolts | |
| what is the stock? albumin thickness?hardware? | |
Manufacture | ||
| ||
| Can be either protrak or tormach, tormach might be easier | |
Assembly | ||
| ||
| ||
| ||
| ||
|
Fins
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| ||
| Stock changed to carbon fiber Cutting to be done 04/04 | |
| ||
| ||
Manufacture | ||
| Bo, Sierra, Joshua, Andrew S | |
| GLOVES | |
Assembly | ||
| ||
| ||
|
Payload Thrust Plate x1
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| ||
| Confirm al 1/2in? hardware? | |
Manufacture | ||
| ||
| ||
Assembly | ||
| ||
|
Motor Retainer x2
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| ||
| ||
| confirm al 1/2in? hardware? | |
Manufacture | ||
| ||
| ||
Assembly | ||
| ||
Add other bullets please |
Motor Tube x2
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| Bo, Eve | |
| ||
| hardware? | |
Manufacture | ||
| Bo, Andrew L, Andrew S | |
Assembly | ||
| Bo | |
| ||
| ||
| make spacers | |
|
Bottom Stage...? please fill out
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| Team | |
| Cornelius O'Leary (RIT Student) | |
Manufacture | ||
| Bo, Andrew L | |
Assembly | ||
| ||
|
Avionics
Av bay
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | ||
| hardware? | |
| Sierra Dacey (RIT Student) | super imporant to get ahead of this before manufacturing starts |
| ||
Manufacture | ||
| Eve | |
| ||
Assembly | ||
| ||
| ||
|
Camera
Task | Assigned | Comments/Progress/Blockers |
---|---|---|
Design | Camera most likely 86'ed, unless cheap alternative found or team pitches in | |
| ||
| ||
| ||
Manufacture | ||
| ||
Assembly | ||
|
Imagine RIT Poster
Task | Assigned | Comments/Progress/Blocker |
---|---|---|
| ||
|