Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
---|
AV Bay: Jonah Gimmi (RIT Student) Mary Dertinger (RIT Student) Riley Quinn (RIT Student) | - Confirm Big Red Bee Size
- Finish layout of bay
| - Nothing much put planning
| - CAD 77cm antenna Hayden
- Finish layout of bay 3 versions by Saturday Mary, Riley, Jonah
- Review layout on Saturday with group
|
|
Airbrake: Grace Dertinger (RIT Alumni) | - Bushing holes for press fit
- Double check airbrake design and fitting
- Fix motor to mid plate (hole in front of the motor)
| Nothing | - Bushing holes for press fit Grace
- Double check airbrake design and fitting Grace
- Fix motor to mid plate (hole in front of the motor) Grace
- Weights Grace/Riley
|
|
Recovery: Grace Dertinger (RIT Alumni) Hayden Quinn (RIT Student) | - Pick out chute
- Snatch force
- Where to reef the chute
- FEA on snatch force
- Wire holes in recovery bay
- Split the recovery bay box into walls
| - Picked out chute its 4ft
- Snatch force of 1450 N for FEA
| - Where to reef the chute Hayden/Grace
- FEA on snatch force Hayden/Riley/Grace
- Wire holes in recovery bay Hayden
- Split the recovery bay box into walls Hayden
|
|
COTS Avionics: Louis Fleisher (RIT Student) | |
| - Make sure battery is in stock
| Blocked by size |
SCRAP: Jim Heaney (RIT Student) | - Continue working on SCRAP
| - Schematic is mostly done
- Load cell filtering and data collection
| - Finish up schematic in one week
|
|
Other |
|
|
|
|