09 December 2023
Project Team Updates
IREC:
Progress report
Due Dec 13th (15th actual)
BOMs in progress
Air BNB research
Payloads Grim Reefer shcem review first week we get back
Alan just needs to finalize the BOM
Avi POTATO review over break; order by the time we get back
Winding CF tube today
Strain gauge finalized and being ordered
PIZZA MEETING on monday
wrapping up semester today and Monday; prepping for break grind
Space Race:
Public Unsafety
Get going for that at the beginning of next semester (need to have it finalized over break)
Getting to the point where we are going to be CADing over break
Need to get everyone onto the Fusion team (I only had them in the project)
Running into motor concerns: worried about it arriving in time, but we have found multiples of the main one we are looking at (L990)
Spencer
Payload-SOP
Structures-Motor selection and nose cone
Avionics-AV Bay/components
Recov MIA
Rocket name is Spencer (pronounced xpa7234@rit.edu)
Working on CAD, SOP, and picking out components and putting them on the BOM.
Taking avionics components from Rock Bottom
L1 Build:
Success!!!
Reorganized the inventory sheet and plan to redo inventory at the start of next semester
Tentative build day 2 ideas:
March: the weekend before spring break
February: anytime really
Work on things over break
CAD model
Instructions
Liquids:
Made liquid prop timeline
Met w/ EHS
Went REALLY WELL
Gave us permission to manufacture prototypes pending a material and tool plan approved by the shed (Jim and Mike)
Liked our timeline
Were ok with proof testing both on and off campus (off preferred, but on is allowed)
Are open to less big meetings and more casual email exchanges for permissions
BOM not bomb.
Solids:
Flow Chart
SOP procedure
Sending SOP to Scott and eventually EHS
Avionics:
Finished layout reviews this week
Power Mod ready to go
Sensor Mod doing some changes over break
JLCPCB Sponsprship
Asked Donovan how JLC sponsorship was going
Need access to FB first for sponsorship form :v
Onboarded 3 new SW people
Great timing
Checking out avionics equipment for co-op
A lot of back pain
Ground Station?
Doing some extra SW work on it
Avionics doesn’t really need Spring semester
Prop also doesn’t seem to need it based on their timeline
Probably a lot of back pain too if they want it
Aaron
Chloe
EBoard updates
President:
Give Nat and Patrick access to edit Dozuki
Vice President:
Jaden slept thru his alarm :(
Director of Operations:
Talked to Spencer about CDR and video transmitters
EHS meeting went well (everyone’s already talked about it probably)
Latest from Jim is that winter break move-in is doable (no promises though)
Scheduled meeting with Humphrey on Monday to talk about IREC test setup in more detail
Break TODOs
Admin SOP
Wiki cleanup and transfer
Drive cleanup
MATLAB training (copying Nate L)
Treasurer:
Sponsorship:
December Newsletter was made and went out on Wednesday
lots of great launch pics
Any update on the FB?
Public Relations:
made post for fueling the future
currently making another post for a reminder on fueling the future
made a post on twitter!!
will make a december recap post
looking through media folders
Secretary:
Emailed staff about polo sizing
met with louis abt opening polo shop
Opened polo shop
Game night
02 December 2023
Project Team Updates
IREC:
IREC CDRs went pretty well (good feedback)
adding feedback to action items and assigning them
Ordering parts (motor ASAP)
Need to hammer out POTATO
strain gague selection
Analysis on structural stuff
Payload needs reorg; make everything fit
Minimal design changes needed at this stage
Need reservations for AirBnB
Space Race:
Public Unsafety:
Yev talked CDR
Downselecting
Early CAD-ing
Spencer
L1
Liquids:
Met with Humphrey again
Got method of characteristics working for our nozzle
Improved simulation where it seems accurate
Got a lot of professors to reach out to
Reach out to imaging science for high speed and thermal cameras
Potentially getting an ANSYS performance team license
Meeting with EHS next week to go over new timeline and prototyping
Solids:
New chemical flowchart
Mixing amounts
Avionics:
Layout review pushed back a week
L Hardware team
Software team is balling though
Much software progress (all nighters)
Discussed plan for the upcoming months (people going on coop)
EBoard updates
President:
Humphrey idea: Nitron 1 coke and mentos rocket
Vice President:
Spoke with Wynter about future plans for stem outreach
Finalizing what we are doing after general today
Sent message to alumni about fueling the future fundraising
Director of Operations:
Helped run CDRs
Sent slides to LAB and alumni for more feedback
Only got a response from billy so far
Bug the following people:
Humpfrey about full set of test fixture draings
Humpfrey about getting strain gauge to play with
Carter & Wellin about CDR feedback
Treasurer:
Merch was ordered
We have money now!! :moneybag:
Still working on cancelling L1 order from Sept
Meeting with person at Northrop about sponsorship 12/14
Make sure to pick up anything ordered at machine shop
Sponsorship:
Worked on more of the Weggies application
Sent an email to CADWind for winding sim software
Working on the newsletter for December
MEMES WILL START TONIGHT IF I DO NOT HAVE ALL THE UPDATES
Public Relations:
made post on instagram for november recap
downloaded massive zip files of media and will begin going through it and moving over to drive
action item: post IREC video on youtube, make a post of fueling the future fundraiser
Secretary:
Merch was ordered!
Working on polos
thanksgiving was hecka successful
game night game night game night
18 November 2023
Project Team Updates
IREC:
Small change to CDR scheduling (avi on monday)
CAD/schematics underway
Blocked by structures (strain gague)
First wind went well
better surface finish than in past
Another test wind today
CAD priority
GRIND; following up today
Jake/Will/Donovan determined M3400 won’t work
effective rail length on main OR incorrect (17ft orig; ~12ft actual)
Most higher impulse → longer burn time → slower V off rod :(
V off rod way too low
New motor needed
Gave some prelim feedback
starting to fill out CDR slides
Layout updates; following up today
Need to be better about updates during meetings
CDR stuff
Payload pushed back for time/availability
Avi pushing hard
Structures
Met with flyer of record
Payload
Recov
Space Race:
Public Unsafety
PDR went decently well :)
Reviewing notes and beginning final component selection
Added people to the Fusion 360 drive and created the Fusion project
Spencer:
PDR today!!!!!!!
Thank you Yev, Wynter, Nate, and Damian for coming late to view the practice PDR
L1:
Store posted for the 12/3 build day
Use the construct for now (Laser should be working again)
Liquids:
decided on a logo
met with Humphrey
set rough CDR date
15 months of design
6 months of manufacturing
3 months hot fire/cold flow
Adds to 2 years
March 3rd
major change was doubling design design
Solids:
Reliant Robin procedure bad
ORGO
SLAG (need disposal; harder to dispose of than fuel)
FUEL
Person, Emergency/firefighting, Material, Glassware, Fumehood
Lukewarm Phoenix is the new procedure
Created Lab endcodes: stop procedures upon reaching a failure condition
Flowchart in progress
Prelab checklists
Prelab quiz for all members
Avionics:
Backplane
Power mod rev2 layout review went really well. Delta review next meeting
Sensor mod rev2 layout almost done. Review ready next meeting
Aaron set up Ethernet communcation demo with power mod rev1
Successful radio mod wireless testing, Aaron’s code was wrong
Chloe and Louis have started attending Liquids meetings. Liquids Avionics REs
Software people getting ramped up with ZephyrRTOS
IREC
weight reductions (topology studies)
POTATO waiting on structures
Most of av bay CAD done
Ben helping with Grim Reefer parts selection
Electronics and Textiles lab in SHED is fully online
Hours are 9-5, going to be extended soon according to Jim
Can stay in after hours with Yev supervision
Going to coordinate training session with Jim for soldering
EBoard updates
President:
send Nat/PAtrick dozuki
check motor purchasing and transport guidelines
Send to yev
Vice President:
Find school contact info
Director of Operations:
Asked Mike questions (see answers)
Met with Dom and FoR
CDR rescheduling
New room reservations confirmed
Send out to LAB & alumni
Treasurer:
We can buy merch now
I need to buy the merch now
Need to cancel L1 motor order
Venessa needs to respond to emails better
We got a surprise $3.4k
I dont know why
Sponsorship:
Monthly newsletter went out on Monday
Emailed IREC CDR schedule on Monday
JLCPCB sponsorship application through FB now?
Need someone to get access to our FB
Emailed updated CDR schedule yesterday
Found Wegman’s sponsorship application, made an account for us on the LastPass and started the application
They specifically say they do not fund travel expenses, so I plan to lean heavily on the freshman learning aspect of our club
Public Relations:
updated the sponsors page on the website
added new sponsorship packet to website
Reorganized the page a bit
working on a post for november recap
attempted facebook login again
still jank
Secretary:
Launch thanksgiving launch thanksgiving launch thanksgiving
went shopping
Met with Louis
11 November 2023
Project Team Updates
IREC
Payload: November 20th, 7:30 - 9:00 PM in INS 1140
Avionics: November 21st, 7:30 - 9:00 PM in INS 1180
Recovery: November 27th, 6:00 - 7:00 PM in INS 1140
Structures: November 27th, 7:00 - 8:30 PM in INS 1140
Working with avionics to determine av layouts, strain gauge selection, etc
CDR Schedule has been drafted, locations TBD
POTATO + Payload custom board schematics making great progress
Payload component layout + CAD is making great strides
Recovery is predominantly complete; getting CDR slides ready
Structures is going to begin winding today!
Had a discussion with RE’s + Gorb about test launch feasibility. Moral of the story is that it hinges on structures; if they can produce duplicate parts to facilitate a rebuild in the event of Cato before the test launch, then it is a go - otherwise, we should prioritize prep for SA Cup.
The rocket is named OMEN!!!!!!
SR
Finished up the PDR slides and did a full run-through
PDR is today
Slides need to be cleaned up.
Will do a practice presentation on Thursday
Presenting next week, 11/18/2023
Will be watching and supporting Public UnSafety today
Look for other motors to purchase. Get back to Louis as soon as possible.
Purchased motor tubes (finally!!)
Let’s not use 3d printed motor tubes before test-fitting them with a dud
Probably not building tomorrow. Next week?
The one in the construct is being wonky
December 3rd
Talk to Louis about setting up store
Plan about 3d printing and laser cutting parts
Public Unsafety: