9. Fall 2023 Leads

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

9. Fall 2023 Leads

Table of Contents

09 December 2023

Project Team Updates

IREC:

  • Progress report

    • Due Dec 13th (15th actual)

    • BOMs in progress

    • Air BNB research

  • Payloads Grim Reefer shcem review first week we get back

    • Alan just needs to finalize the BOM

  • Avi POTATO review over break; order by the time we get back

  • Winding CF tube today

  • Strain gauge finalized and being ordered

  • PIZZA MEETING on monday

  • wrapping up semester today and Monday; prepping for break grind

Space Race:

  • Public Unsafety

    • Get going for that at the beginning of next semester (need to have it finalized over break)

    • Getting to the point where we are going to be CADing over break

    • Need to get everyone onto the Fusion team (I only had them in the project)

    • Running into motor concerns: worried about it arriving in time, but we have found multiples of the main one we are looking at (L990)

  • Spencer

    • Payload-SOP

    • Structures-Motor selection and nose cone

    • Avionics-AV Bay/components

    • Recov MIA

    • Rocket name is Spencer (pronounced xpa7234@rit.edu)

    • Working on CAD, SOP, and picking out components and putting them on the BOM.

    • Taking avionics components from Rock Bottom

L1 Build:

  • Success!!!

  • Reorganized the inventory sheet and plan to redo inventory at the start of next semester

  • Tentative build day 2 ideas:

    • March: the weekend before spring break

    • February: anytime really

  • Work on things over break

    • CAD model

    • Instructions

Liquids:

  • Made liquid prop timeline

  • Met w/ EHS

    • Went REALLY WELL

    • Gave us permission to manufacture prototypes pending a material and tool plan approved by the shed (Jim and Mike)

    • Liked our timeline

    • Were ok with proof testing both on and off campus (off preferred, but on is allowed)

    • Are open to less big meetings and more casual email exchanges for permissions

    • BOM not bomb.

Solids:

  • Flow Chart

  • SOP procedure

  • Sending SOP to Scott and eventually EHS

Avionics:

  • Finished layout reviews this week

    • Power Mod ready to go

    • Sensor Mod doing some changes over break

  • JLCPCB Sponsprship

    • Asked Donovan how JLC sponsorship was going

    • Need access to FB first for sponsorship form :v

  • Onboarded 3 new SW people

    • Great timing

  • Checking out avionics equipment for co-op

    • A lot of back pain

    • Ground Station?

      • Doing some extra SW work on it

      • Avionics doesn’t really need Spring semester

      • Prop also doesn’t seem to need it based on their timeline

    • Probably a lot of back pain too if they want it

    • Aaron

    • Chloe

EBoard updates

President:

  • Give Nat and Patrick access to edit Dozuki

Vice President:

  • Jaden slept thru his alarm :(

Director of Operations:

  • Talked to Spencer about CDR and video transmitters

  • EHS meeting went well (everyone’s already talked about it probably)

  • Latest from Jim is that winter break move-in is doable (no promises though)

  • Scheduled meeting with Humphrey on Monday to talk about IREC test setup in more detail

  • Break TODOs

    • Admin SOP

    • Wiki cleanup and transfer

    • Drive cleanup

    • MATLAB training (copying Nate L)

Treasurer:
Sponsorship:

  • December Newsletter was made and went out on Wednesday

    • lots of great launch pics

  • Any update on the FB?

Public Relations:

  • made post for fueling the future

    • currently making another post for a reminder on fueling the future

  • made a post on twitter!!

  • will make a december recap post

  • looking through media folders

Secretary:
Emailed staff about polo sizing
met with louis abt opening polo shop
Opened polo shop
Game night

02 December 2023

Project Team Updates

IREC:

  • IREC CDRs went pretty well (good feedback)

    • adding feedback to action items and assigning them

    • Ordering parts (motor ASAP)

    • Need to hammer out POTATO

    • strain gague selection

    • Analysis on structural stuff

    • Payload needs reorg; make everything fit

    • Minimal design changes needed at this stage

    • Need reservations for AirBnB

Space Race:

  • Public Unsafety:

    • Yev talked CDR

    • Downselecting

    • Early CAD-ing

  • Spencer

  • L1

Liquids:

  • Met with Humphrey again

  • Got method of characteristics working for our nozzle

  • Improved simulation where it seems accurate

  • Got a lot of professors to reach out to

  • Reach out to imaging science for high speed and thermal cameras

  • Potentially getting an ANSYS performance team license

  • Meeting with EHS next week to go over new timeline and prototyping

Solids:

  • New chemical flowchart

  • Mixing amounts

Avionics:

  • Layout review pushed back a week

    • L Hardware team

  • Software team is balling though

    • Much software progress (all nighters)

    • Discussed plan for the upcoming months (people going on coop)

EBoard updates

President:

  • Humphrey idea: Nitron 1 coke and mentos rocket

Vice President:

  • Spoke with Wynter about future plans for stem outreach

    • Finalizing what we are doing after general today

  • Sent message to alumni about fueling the future fundraising

Director of Operations:

  • Helped run CDRs

  • Sent slides to LAB and alumni for more feedback

    • Only got a response from billy so far

  • Bug the following people:

    • Humpfrey about full set of test fixture draings

    • Humpfrey about getting strain gauge to play with

    • Carter & Wellin about CDR feedback

Treasurer:

  • Merch was ordered

  • We have money now!! :moneybag:

  • Still working on cancelling L1 order from Sept

  • Meeting with person at Northrop about sponsorship 12/14

  • Make sure to pick up anything ordered at machine shop

Sponsorship:

  • Worked on more of the Weggies application

  • Sent an email to CADWind for winding sim software

  • Working on the newsletter for December

    • MEMES WILL START TONIGHT IF I DO NOT HAVE ALL THE UPDATES

Public Relations:

  • made post on instagram for november recap

  • downloaded massive zip files of media and will begin going through it and moving over to drive

  • action item: post IREC video on youtube, make a post of fueling the future fundraiser

Secretary:

  • Merch was ordered!

  • Working on polos

  • thanksgiving was hecka successful

  • game night game night game night

18 November 2023

Project Team Updates

IREC:

  • Small change to CDR scheduling (avi on monday)

    • CAD/schematics underway

    • Blocked by structures (strain gague)

    • First wind went well

      • better surface finish than in past

      • Another test wind today

    • CAD priority

    • GRIND; following up today

    • Jake/Will/Donovan determined M3400 won’t work

      • effective rail length on main OR incorrect (17ft orig; ~12ft actual)

      • Most higher impulse → longer burn time → slower V off rod :(

      • V off rod way too low

      • New motor needed

    • Gave some prelim feedback

    • starting to fill out CDR slides

      • Layout updates; following up today

    • Need to be better about updates during meetings

    • CDR stuff

    • Payload pushed back for time/availability

    • Avi pushing hard

    • Structures

    • Met with flyer of record

    • Payload

    • Recov

Space Race:

  • Public Unsafety

    • PDR went decently well :)

    • Reviewing notes and beginning final component selection

    • Added people to the Fusion 360 drive and created the Fusion project

  • Spencer:

    • PDR today!!!!!!!

    • Thank you Yev, Wynter, Nate, and Damian for coming late to view the practice PDR

L1:

  • Store posted for the 12/3 build day

  • Use the construct for now (Laser should be working again)

Liquids:

  • decided on a logo

  • met with Humphrey

  • set rough CDR date

    • 15 months of design

    • 6 months of manufacturing

    • 3 months hot fire/cold flow

    • Adds to 2 years

    • March 3rd

    • major change was doubling design design

Solids:

  • Reliant Robin procedure bad

    • ORGO

    • SLAG (need disposal; harder to dispose of than fuel)

    • FUEL

    • Person, Emergency/firefighting, Material, Glassware, Fumehood

    • Lukewarm Phoenix is the new procedure

    • Created Lab endcodes: stop procedures upon reaching a failure condition

    • Flowchart in progress

    • Prelab checklists

    • Prelab quiz for all members

Avionics:

  • Backplane

    • Power mod rev2 layout review went really well. Delta review next meeting

    • Sensor mod rev2 layout almost done. Review ready next meeting

    • Aaron set up Ethernet communcation demo with power mod rev1

    • Successful radio mod wireless testing, Aaron’s code was wrong

  • Chloe and Louis have started attending Liquids meetings. Liquids Avionics REs

  • Software people getting ramped up with ZephyrRTOS

  • IREC

    • weight reductions (topology studies)

    • POTATO waiting on structures

    • Most of av bay CAD done

    • Ben helping with Grim Reefer parts selection

  • Electronics and Textiles lab in SHED is fully online

    • Hours are 9-5, going to be extended soon according to Jim

    • Can stay in after hours with Yev supervision

    • Going to coordinate training session with Jim for soldering

EBoard updates

President:

  • send Nat/PAtrick dozuki

  • check motor purchasing and transport guidelines

    • Send to yev

Vice President:

  • Find school contact info

Director of Operations:

  • Asked Mike questions (see answers)

  • Met with Dom and FoR

  • CDR rescheduling

    • New room reservations confirmed

    • Send out to LAB & alumni

Treasurer:

  • We can buy merch now

  • I need to buy the merch now

  • Need to cancel L1 motor order

  • Venessa needs to respond to emails better

  • We got a surprise $3.4k

    • I dont know why

Sponsorship:

  • Monthly newsletter went out on Monday

  • Emailed IREC CDR schedule on Monday

  • JLCPCB sponsorship application through FB now?

    • Need someone to get access to our FB

  • Emailed updated CDR schedule yesterday

  • Found Wegman’s sponsorship application, made an account for us on the LastPass and started the application

    • They specifically say they do not fund travel expenses, so I plan to lean heavily on the freshman learning aspect of our club

Public Relations:

  • updated the sponsors page on the website

    • added new sponsorship packet to website

    • Reorganized the page a bit

  • working on a post for november recap

  • attempted facebook login again

    • still jank

Secretary:

  • Launch thanksgiving launch thanksgiving launch thanksgiving

  • went shopping

  • Met with Louis

11 November 2023

Project Team Updates

  • IREC

    • Payload: November 20th, 7:30 - 9:00 PM in INS 1140

    • Avionics: November 21st, 7:30 - 9:00 PM in INS 1180

    • Recovery: November 27th, 6:00 - 7:00 PM in INS 1140

    • Structures: November 27th, 7:00 - 8:30 PM in INS 1140

    • Working with avionics to determine av layouts, strain gauge selection, etc

    • CDR Schedule has been drafted, locations TBD

    • POTATO + Payload custom board schematics making great progress

    • Payload component layout + CAD is making great strides

    • Recovery is predominantly complete; getting CDR slides ready

    • Structures is going to begin winding today!

    • Had a discussion with RE’s + Gorb about test launch feasibility. Moral of the story is that it hinges on structures; if they can produce duplicate parts to facilitate a rebuild in the event of Cato before the test launch, then it is a go - otherwise, we should prioritize prep for SA Cup.

    • The rocket is named OMEN!!!!!!

  • SR

    • Finished up the PDR slides and did a full run-through

    • PDR is today

    • Slides need to be cleaned up.

      • Will do a practice presentation on Thursday

      • Presenting next week, 11/18/2023

    • Will be watching and supporting Public UnSafety today

    • Look for other motors to purchase. Get back to Louis as soon as possible.

    • Purchased motor tubes (finally!!)

      • Let’s not use 3d printed motor tubes before test-fitting them with a dud

    • Probably not building tomorrow. Next week?

      • The one in the construct is being wonky

      • December 3rd

      • Talk to Louis about setting up store

      • Plan about 3d printing and laser cutting parts

    • Public Unsafety: