Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
---|
|
| - Work session Saturday
- Finished layout in ave bay
- CAD antenna mounts
| - Mount Scrap and all other components with stand offs/other stuff done by this weekend Riley/Hayden
- Laser cut walls decide the material of walls (acrylic or fiberglass)
- Make sure we have access to screw switches Hayden
|
|
|
| - Bushing holes for press fit Grace
- Double check airbrake design and fitting Grace
- Fix motor to mid plate (hole in front of the motor) Grace
- Weights Grace/Riley
- Printed airbake to make sure it works
- Motor CAD
| - Order hardware Grace/Louis
- order send cut send parts and material for us to mill leaves Grace
- What to make and not to make Grace
- Stock in basement Grace
- order load cells Louis
- Look over Airbrake CAD Jonah
|
|
|
|
- Working of FEA
- Split the recovery bay box into walls Hayden
- Look into chute size to make sure it will fit it FITS!
- Spec chute bag
| - CFD for drag coefficient/load of the airbrakes
- FEA on snatch force check Leo/Jonah
- Wire holes in recovery bay Hayden
- Look into making our own chute bag Jonah/Louis/Leo
- Look into reefing Leo
|
|
| | - Load cell ordered
- COTs flight computer ordered
| - Order batteries Louis
- Antennas Louis
- Connectors from scrap to computers (JST 2mm pig tail) Louis
- Order Screw Switches (buy from Florida) Louis
| Blocked by size |
| - Continue working on SCRAP
- Done with schematic
| | - Have avionics team check schematic/layout of scrap Jim
- Edit from feedback Jim
- Final battery check Jim
- order Louis
|
|
Other |
|
|
|
|