Semester 2
Important Dates:
March 6-13 Spring Break
April 27 Final Exams Start
Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: |
---|---|---|---|---|---|
Av bay sled | Determine materials, 3D print/laser cut | 1/24/22 | Soon | ||
Finalize Motor for Air brakes | N/A | 1/24/22 | Soon | ||
Order Avionics | N/A | 1/24/22 | Very soon | Proton 2x, Batteries etc. see BOM | |
Order & finalize parachute, eyebolts, shockcord. | N/A | 1/28/22 | End of body manufacture3/5/22 | Structures team needs to figure out the parachute size needed and find a best fit for the rocket. | |
Solder Protons and Transmitter board | Very carefully solder connections to boards | 1/28/22 | 3/5/22 | BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... | |
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing | ||
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing | Do not directly connect source and ground. You will have a bad time. | |
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts | ||
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 | 3/5/22 | ||
Install Motor next to airbrakes | Align correctly. | 1/28/22 | End of Av Bay Manufacturing |