Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: | |
---|---|---|---|---|---|---|
Av bay sled | Determine materials, 3D print/laser cut | 1/24/22 | Soon | |||
Finalize Motor for Air brakes | N/A | 1/24/22 | Soon | |||
Order Avionics | N/A | 1/24/22 | Very soon | Proton 2x, Batteries etc. see BOM | ||
Order & finalize parachute, eyebolts, shockcord. | N/A | 1/28/22 | 3/5/22 | Structures team needs to figure out the parachute size needed and find a best fit for the rocket. | ||
Solder Protons and Transmitter board | Very carefully solder connections to boards | 1/28/22 | 3/5/22 | BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... | ||
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing | |||
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing | Do not directly connect source and ground. You will have a bad time. | ||
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts | |||
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 | 3/5/22 | |||
Install Motor next to airbrakes | Align correctly. | 1/28/22 | End of Av Bay Manufacturing |
...