April 27 Final Exams Start
Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: |
---|
Av bay sledAssign tasks to people/groups. |
| 1/28/22 | Ongoing | Ongoing | We need to get groups working on specific action items. |
Avionics Bay Sled | Determine materials, 3D print/laser cut | 1/24/22 |
Soon3/5/22 |
| Avionics group should finalize details and CAD soon. |
Finalize Motor for Air brakes | N/A | 1/24/22 |
Soon1/31/22 | 1/28/22 | Use motor in BOM assuming airbrakes is still okay with it. |
Order Avionics | N/A | 1/24/22 |
Very soonASAP |
| Proton 2x, Batteries etc. see BOM |
Order & finalize parachute, eyebolts, shockcord. | N/A | 1/28/22 | 3/5/22 |
| Structures team needs to figure out the parachute size needed and find a best fit for the rocket. |
Solder Protons and Transmitter board | Very carefully solder connections to boards | 1/28/22 | 3/5/22 |
| BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... |
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing |
|
|
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing |
| Do not directly connect source and ground. You will have a bad time. Decide on how we are going to secure everything within the av bay. |
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts |
|
|
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 |
3/5/22ASAP |
|
|
Install Motor next to airbrakes | Align correctly. | 1/28/22 | End of Av Bay Manufacturing |
|
|
Finalize materials needed for air break | Finalize parts list and stock. Put needed things in BOM | 1/28/22 | ASAP |
|
|
Order materials for air break | N/A | 1/28/22 | ASAP |
| Highlight the items |
Manufacture air break | N/A | 1/28/22 | 3/20/22 |
| Airbrake group is on this |
Manufacture Thrust Plate | N/A | 1/28/22 | 3/20/22 |
| Structures on this |
Cut and Glue Fins | N/A | 1/28/22 | 3/20/22 |
| Structures on this |
Make and wire up black powder charges | We need to first determine the materials we need to make this. | 1/28/22 | Before we close up the rocket |
| We should find someone who knows how to do this. |
Build Camera stabilizing system | Produce parts and assembly | 1/28/22 | 3/5/22 |
| Camera group |
Make parts for engineering camera system | Print/cut | 1/28/22 | 3/5/22 |
| Camera group |
Wire up camera systems | N/A | 1/28/22 | 3/20/22 |
| Camera group with help of avionics if needed |
Get switch for avionics system | We also need to install it . | 1/28/22 | 3/5/22 |
| What switch is being used? |
Have Fun | idk | -∞ | ∞ | ∞ |
|