...
Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Assign tasks to people/groups. | 1/28/22 | Ongoing | Ongoing | We need to get groups working on specific action items. | |||||||||||
CAD Entire Rocket | 1/29/22 | ASAP | Teams need to work together to get this together. | ||||||||||||
Add and Highlight BOM Parts to Order | 1/29/22 | Ongoing | Ongoing | Confirm parts with group, Domenic, and highlight | |||||||||||
We Need Money Guys. | Search your couch cushions, sell your belongings, beg on the street. | 1/29/22 | Ongoing | Ongoing | $$$$$$$. Don't sell your kidney. You might need that. | ||||||||||
Avionics Bay Sled | Determine materials, Order materials, 3D print/laser cut, assemble/glue | 1/24/22 | 3/5/22 | Avionics group should finalize details and CAD soon. Make parts | |||||||||||
Finalize Motor for Air brakes and order it | Re-simulate motor and selection | 1/24/22 | 2/05/22 | ||||||||||||
Order Avionics | N/A | 1/24/22 | ASAP | Proton 2x, Batteries, transmitter etc. see BOM | |||||||||||
Order & finalize parachute, eyebolts, shockcord, streamer | CAD, Calculate chute size, attach streamer | 1/28/22 | 3/5/22 | Structures team needs to figure out the parachute size needed and find a best fit for the rocket. | |||||||||||
Solder Avionics boards | Very carefully solder connections to boards | 1/28/22 | 3/5/22 | BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... | |||||||||||
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing | ||||||||||||
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing | Do not directly connect source and ground. You will have a bad time. Decide on how we are going to secure everything within the av bay. | |||||||||||
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts | ||||||||||||
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 | ASAP | ||||||||||||
Finalize materials needed for air break | Finalize parts list and stock. Put needed things in BOM | 1/28/22 | ASAP | ||||||||||||
Rods/ lead screws | CAD, find what is needed ^ | 1/29/22 | CAD ASAP | ||||||||||||
Motor attachment to air break | Figure it out, CAD, assembly/install^ | 1/29/22 | CAD ASAP | ||||||||||||
Order materials for air break | N/A^ | 1/28/22 | ASAP | Highlight the items | |||||||||||
Manufacture air break | CAD and Manufacture | 1/28/22 | CAD ASAP 3/20/22 | Airbrake group is on this | Manufacture Thrust Plate | N/A | 1/28/22 | 3/20/22 | Structures on this | Cut and Glue Fins | N/A | 1/28/22 | 3/20/22 | Structures on this | |
Make and wire up black powder charges | We need to first determine the materials we need to make this. | 1/28/22 | Before we close up the rocket | We should find someone who knows how to do this. | |||||||||||
Get switch for avionics system | We also need to install it . | 1/28/22 | 3/5/22 | What switch is being used? | |||||||||||
Nose Cone | Make and glue bulkhead, order part | 1/29/22 | 3/5/22 | ||||||||||||
Four Plywood Bulkheads | CAD, order stock, cut, epoxy to tubes, FEA on top bulkhead | 1/29/22 | CAD ASAP 3/5/22 | ||||||||||||
Look into avionics alternatives | Substitute Eggtimer parts | 1/29/22 | ASAP | ||||||||||||
Update wiring diagram | N/A | 1/29/22 | ASAP | Update with new parts as needed | |||||||||||
Airbreak Calculations | FEA, Assembly, joints, snatch force | 1/29/22 | ASAP | ||||||||||||
Assemble "All or nothing" parachute system | 1/29/22 | 3/5/22 | |||||||||||||
Chute Bulkhead | CAD, FEA, I bolts, order stock, manufacture, epoxy to tubes | 1/29/22 | CAD ASAP 3/5/22 | ||||||||||||
Camera Bulkhead | CAD, FEA, determine size, order stock, manufacture, mount camera | 1/29/22 | CAD ASAP 3/5/22 | ||||||||||||
Mount Camera to bulkhead | ^ | 1/29/22 | 3/5/22 | ||||||||||||
Set Screw or L bracket into rods for AV Bay placement | Determine how its going to work, CAD, order parts, attach | 1/29/22 | CAD ASAP 3/5/22 | ||||||||||||
Make jig for air break? | 1/29/22 | ||||||||||||||
Airbreak Webbing | CAD, Order, "Gromit" it to airbreak | 1/29/22 | Button head screw, "Gromit", Washers | ||||||||||||
CAD and print jig for cutting blue tube | 1/29/22 | ASAP | For airbreaks | ||||||||||||
Figure out Airbrake Assembly order and integration | 1/29/22 | ASAP | |||||||||||||
CAD and 3D Print Engineering Camera Casing | CAD Integration and 3D print | 1/29/22 | CAD ASAP 3/5/22 | ||||||||||||
Order parts for engineering camera | 1/29/22 | ASAP | |||||||||||||
Make jig and cut blue tube | Cut blue tube for engineering camera | 1/29/22 | 3/5/22 | ||||||||||||
Manufacture Engineering Camera system | Wire up, install, epoxy | 1/29/22 | 3/5/22 | ||||||||||||
CAD Scenic Camera | CAD and integrate CAD into rocket | 1/29/22 | ASAP | ||||||||||||
Order parts for scenic camera | 1/29/22 | ASAP | |||||||||||||
Manufacture Parts for scenic camera | 1/29/22 | 3/5/22 | |||||||||||||
Assemble scenic camera | 1/29/22 | ||||||||||||||
Fins CAD | Have CADed fins in model | 1/29/22 | CAD ASAP | ||||||||||||
Order stock and manufacture fins | Send to "Send cut send" | 1/29/22 | |||||||||||||
Attach Fins | 1/29/22 | ||||||||||||||
Calculations FEA for motor | 1/29/22 | Done? | |||||||||||||
CAD/Assembly for Rocket Motor | 1/29/22 | CAD ASAP | Assembly for everything rocket motor | ||||||||||||
Manufacture thrust plate | Order stock and cut | 1/29/22 | 3/5/22 | ||||||||||||
Order stock for Rocket Motor | 1/29/22 | ||||||||||||||
Have Fun | idk | -∞ | ∞ | ∞ | Get to work |
...