...
- FDR
- Start sanding tubes
- 1 bulkhead finished
- If fiberglass is here then layup nose cone
- Cut tubes to length
- redo bulkhead FEA
- Research into layups for learning
- Machine Bulkheads
- Sand tubes to length
- explore nose cone lay up options
- Look into fin stabilizing options
- Fin can CAD
This week
- Machine bulkhead x2
- Sand tubes to length
- Bulkhead holes for avionics
- Finish tubes with epoxy layer
- Publish schedule
- edit action items list
- confirm OR stuffstuff
- Finalize masses
- explore Make new nose cone lay up options Jake Halpern (RIT Student)
- Look into fin stabilizing options Nathan Aquilio (RIT Student)
- Fin machine rectangles
- Cut fins
Next week
- IREC 101
- Fin can 3d print
Payload
Last week
- Making parashot bay
- Darwin progress- joe approved/redesign
- Order part with approval
- FDR SLIDEs IN
- Payload lid machined
This week
- Continue on Welding parashot bay
- Assemble Darwin
- General GS stuff
- Waiting on Darwin and screw switches
Next week
- Continue Darwin
- And loose end stuff
- General GS stuff
...
- Order ave bay parts
- FDR SLIDES IN
- Waiting for FG tube
- All flying electronics are in
- Parts sent to matt for print
- Xbee module Worked on
This week
- Xbee module Worked onwaiting
- MS561 barometer/temp sensor worked on
Next week
- Assembly of bay
- Vacuum test flight computers
- MS561 barometer/temp sensor worked on
- (waiting for whole bay)
Umbilical
Last week
- Finished review of files, prepped for manufacturing
- Components ordered
- Print aerodynamic shell
This week
- PCBs sent for manufacturing
- Components ordered
- Print aerodynamic shell
- Wait for components to arrive
Next week
- Wait for components to arrive/assembly
Recovery
Last week
- Enjoy Spring Break
This week
...