Updates - VOID

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

Updates - VOID

Date

Jan 27, 2022

Attendees

  • @Will Merges (RIT Student)

  • @Grace Dertinger (RIT Alumni)

  • @Jake Halpern (RIT Student) 

  • @Nathan Aquilio (RIT Student) 

  • @Alex Speyer (RIT Student) 

  • @Ryan Cross (RIT Student) (Deactivated) 

  • @lst5581 

  • @Kenny Kim (RIT Student) 

  • @Brahm Soltes (RIT Student) 

  • @James May (RIT Student) 

Goals

Discussion items

Time

Item

Who

Notes

Time

Item

Who

Notes

 

 

 

 

Action items

General

Last week

This week

poster tomorrow
Tech report due May 13th or 15
Last update 22nd
OR confirm

Next week

Structures

Last Week

FDR
Start sanding tubes
1 bulkhead finished
If fiberglass is here then layup nose cone
Cut tubes to length
redo bulkhead FEA 
Research into layups for learning
Machine Bulkheads
Sand tubes to length
explore nose cone lay up options
Look into fin stabilizing options
Fin can CAD
Finish tubes with epoxy layer 
Make new nose cone
Cut fins
Fin can 3d print
FIN CAN DONE
Fin machine rectangles

This week

Bulkhead holes for avionics
cut fin slots in booster
TOTALLY finish the tube surfaces
All tubes fit together
nose cone fit 
confirm OR stuff 
Finalize masses (make sure we get 5lbs)

Next week

 IREC 101
 Paint
everything else tbh

 

Payload

Last week

Making parashot bay
Darwin progress- joe approved/redesign 
Order part with approval
FDR SLIDEs IN
 Payload lid machined
Welding parashot bay
Assemble Darwin
Waiting on Darwin and screw switches

This week

Assemble more Darwin
General GS stuff
  wire screw switches

Next week

And loose end stuff
General GS stuff
deployment testing eventually

 

Avionics

Last week

Order ave bay parts
FDR SLIDES IN
Waiting for FG tube
All flying electronics are in
Parts sent to matt for print
Xbee module Worked on

This week

waiting antenna 
find more cables
MS561 barometer/temp sensor worked on
 finishing up ave bay cad

Next week

Assembly of bay
Vacuum test flight computers (waiting for whole bay)

 

Umbilical

Last week

Finished review of files, prepped for manufacturing
Components ordered
Print aerodynamic shell
 

This week

 PCBs sent for manufacturing
Wait for components to arrive

Next week

 Wait for components to arrive/assembly

Recovery

Last week

Enjoy Spring Break

This week

Organize all ordered components
Order swivel links
Locate quick links
Order new shock cord as per IREC email

Next week

Start assembling
Start cutting

 

Prop

Last week 

 motor bought 

This week

get motor at comp

Next week

Discuss where to purchase motor @Brahm Soltes (RIT Student) @James