Updates - VOID
Date
Jan 27, 2022
Attendees
@Will Merges (RIT Student)
@Grace Dertinger (RIT Alumni)
@Jake Halpern (RIT Student)
@Nathan Aquilio (RIT Student)
@Alex Speyer (RIT Student)
@Ryan Cross (RIT Student) (Deactivated)
@lst5581
@Kenny Kim (RIT Student)
@Brahm Soltes (RIT Student)
@James May (RIT Student)
Goals
Discussion items
Time | Item | Who | Notes |
|---|---|---|---|
|
|
|
|
Action items
General
Last week
This week
poster tomorrow
Tech report due May 13th or 15
Last update 22nd
OR confirm
Next week
Structures
Last Week
FDR
Start sanding tubes
1 bulkhead finished
If fiberglass is here then layup nose cone
Cut tubes to length
redo bulkhead FEA
Research into layups for learning
Machine Bulkheads
Sand tubes to length
explore nose cone lay up options
Look into fin stabilizing options
Fin can CAD
Finish tubes with epoxy layer
Make new nose cone
Cut fins
Fin can 3d print
FIN CAN DONE
Fin machine rectangles
This week
Bulkhead holes for avionics
cut fin slots in booster
TOTALLY finish the tube surfaces
All tubes fit together
nose cone fit
confirm OR stuff
Finalize masses (make sure we get 5lbs)
Next week
IREC 101
Paint
everything else tbh
Payload
Last week
Making parashot bay
Darwin progress- joe approved/redesign
Order part with approval
FDR SLIDEs IN
Payload lid machined
Welding parashot bay
Assemble Darwin
Waiting on Darwin and screw switches
This week
Assemble more Darwin
General GS stuff
wire screw switches
Next week
And loose end stuff
General GS stuff
deployment testing eventually
Avionics
Last week
Order ave bay parts
FDR SLIDES IN
Waiting for FG tube
All flying electronics are in
Parts sent to matt for print
Xbee module Worked on
This week
waiting antenna
find more cables
MS561 barometer/temp sensor worked on
finishing up ave bay cad
Next week
Assembly of bay
Vacuum test flight computers (waiting for whole bay)
Umbilical
Last week
Finished review of files, prepped for manufacturing
Components ordered
Print aerodynamic shell
This week
PCBs sent for manufacturing
Wait for components to arrive
Next week
Wait for components to arrive/assembly
Recovery
Last week
Enjoy Spring Break
This week
Organize all ordered components
Order swivel links
Locate quick links
Order new shock cord as per IREC email
Next week
Start assembling
Start cutting
Prop
Last week
motor bought
This week
get motor at comp
Next week
Discuss where to purchase motor @Brahm Soltes (RIT Student) @James