...
- FDR
- Start sanding tubes
- 1 bulkhead finished
- If fiberglass is here then layup nose cone
- Cut tubes to length
- redo bulkhead FEA
- Research into layups for learning
- Machine Bulkheads
- Sand tubes to length
- explore nose cone lay up options
- Look into fin stabilizing options
- Fin can CAD
- Finish tubes with epoxy layer
- Make new nose cone
- Cut fins
- Fin can 3d print
- FIN CAN DONE
- Fin machine rectangles
This week
- Bulkhead holes for avionics
- Finish tubes with epoxy layer
- cut fin slots in booster
- TOTALLY finish the tube surfaces
- All tubes fit together
- nose cone fit
- confirm OR stuff
- Finalize masses
- Make new nose cone
- Fin machine rectangles
- Cut fins
- masses (make sure we get 5lbs
Next week
- IREC 101
- Fin can 3d print
Payload
Last week
- Making parashot bay
- Darwin progress- joe approved/redesign
- Order part with approval
- FDR SLIDEs IN
- Payload lid machined
...
- Order ave bay parts
- FDR SLIDES IN
- Waiting for FG tube
- All flying electronics are in
- Parts sent to matt for print
- Xbee module Worked on
This week
- waiting
- MS561 barometer/temp sensor worked on
Next week
- Assembly of bay
- Vacuum test flight computers (waiting for whole bay)
...
- Finished review of files, prepped for manufacturing
- Components ordered
- Print aerodynamic shell
This week
- PCBs sent for manufacturing
- Wait for components to arrive
...
- Organize all ordered components
- Order /locate swivel links
- Locate quick links
- Order new shock cord as per IREC email
Next week
- Start assembling
- Start cutting
Prop
Last week
- motor bought
This week
- Pick motor
- Discuss where to purchase motor
- get motor at comp
Next week
- Discuss where to purchase motor Brahm Soltes (RIT Student) @James
...