...
- Prep payload
- Sleds assembled
- Batteries charged
- Everything mounted
- Ematches wired / soldered
- BP prepped in balloons
- Sabot shock cord
- Frame ready
- Everything but batteries plugged in
- Prep av bay
- Everything but batteries
- Ematches wired / soldered
- BP prepped in balloons
- charge wires continuity tested
- Ground station prepped
- Prep receivers
- APRS (433.92MHz)
- Hand-held radios
- DARWIN
Launch (Wednesday June 22nd)
- Startup ground station
- Start RF receivers
- Plug av bay batteries in
- Connect av bay charge wires
- Verify arming switches are off
- Insert av bay
- Payload batteries
- Payload sealed up
- Check BRBs
- Check DARWIN
- Check VTX
- Payload charges
- Payload parachute / recovery gear
- Lens cap!
- Av bay charges
- Seal up
...