Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


SubteamProgress ReportBoulders and GrenadesAction Items
Structures
  • Receipt from Soller Composites
  • boat tail finalized and sent
  • shrink tape purchased
  • money
Analysis
  • Nose cone analysis 
  • meeting with DRIs for CDR
  • payload math checks out
  • met with yev about reaction wheel - on track with schedules
  • Ansys student mesh size limit
  • money
  • Ansys account access
  • Nose cone analysis 
  • Meet with Aaron
  • Send tensile test results to Carter
Avionics
  • Will and Aaron working on software
  • CDR slides being worked
  • Money
  • FEA and Adhesive strength test on the av bay
  • Review of slides
  • Order some avionics
Payload
  • Did matlab code on differential pressures
    • airbrakes make very small difference
  • what do we do 
  • more eyes on matlab
  • try not having the streamer deployed right away
  • have active deployment system so payload falls at terminal for a bit for testing
Reaction Wheel
  • worked on Simulink multibody model
  • design on IREC wheel
  • money
  • cannot get GSL implemented
  • Finish Simulink model and Bluetooth interfacing 
  • rough design of IREC wheel