Subteam | Progress Report | Boulders and Grenades | Action Items |
---|
Structures | - Receipt from Soller Composites
- boat tail finalized and sent
- shrink tape purchased
| | |
Analysis | - Nose cone analysis
- meeting with DRIs for CDR
- payload math checks out
- met with yev about reaction wheel - on track with schedules
| - Ansys student mesh size limit
- money
| - Ansys account access
- Nose cone analysis
- Meet with Aaron
- Send tensile test results to Carter
|
Avionics | - Will and Aaron working on software
- CDR slides being worked
| | - FEA and Adhesive strength test on the av bay
- Review of slides
- Order some avionics
|
Payload | - Did matlab code on differential pressures
- airbrakes make very small difference
| | - more eyes on matlab
- try not having the streamer deployed right away
- have active deployment system so payload falls at terminal for a bit for testing
|
Reaction Wheel | - worked on Simulink multibody model
- design on IREC wheel
| - money
- cannot get GSL implemented
| - Finish Simulink model and Bluetooth interfacing
- rough design of IREC wheel
|