10/25/2022

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

10/25/2022

Subteam

Progress Report

Boulders and Grenades

Action Items

Subteam

Progress Report

Boulders and Grenades

Action Items

Structures

  • Receipt from Soller Composites

  • boat tail finalized and sent

  • shrink tape purchased

  • money

  • dissolvable filament research @Alex Durand (RIT Student) 1.75 mm

  • finishing the R&D tube

  • Winding the booster

Analysis

  • Nose cone analysis 

  • meeting with DRIs for CDR

  • payload math checks out

  • met with yev about reaction wheel - on track with schedules

  • Ansys student mesh size limit

  • money

  • Ansys account access

  • Nose cone analysis 

  • Meet with Aaron

  • Send tensile test results to Carter

Avionics

  • Will and Aaron working on software

  • CDR slides being worked

  • Money

  • FEA and Adhesive strength test on the av bay

  • Review of slides

  • Order some avionics

Payload

  • Did matlab code on differential pressures

    • airbrakes make very small difference

  • what do we do 

  • more eyes on matlab

  • try not having the streamer deployed right away

  • have active deployment system so payload falls at terminal for a bit for testing

Reaction Wheel

  • worked on Simulink multibody model

  • design on IREC wheel

  • money

  • cannot get GSL implemented

  • Finish Simulink model and Bluetooth interfacing 

  • rough design of IREC wheel