Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Last Week:

Initial CAD finished

...

Grace where to reef the chute

Updates:

COTS Avionics:

  • Picked: Arming switches, load cell, flight computer, working on antenna and batteries

Airbrake:

  • Picked: 20kg motor 
  • Airbrake CAD is finished minus holes for bushings and newest load cell

Ave bay:

  • No work done need other components
  • height was updated (have lots of room now)

Recovery:

  • Bay size changed to 100 mm

SCRAP

  • Working away

This week: 

Ave bay: Mary Dertinger (RIT Student)

  • Mary and Jonah start av bay CAD and meet with Yev*
  • remove rounded corners on ave bay columns/bottom plate*
  • Add fiber glass walls*
  • Get components from Louis/Jim
  • put components in CAD
  • Mount components in CAD

Airbrake: Grace Dertinger (RIT Alumni) 

  • put new load cell in CAD
  • bushing holes for press fit
  • double check airbrake design and fitting
  • fix motor to mid plate (hole in front of the motor)

Recovery: Grace Dertinger (RIT Alumni) 

  • pick out chute
  • pick out line cutter
  • Snatch force
  • where to reef the chute
  • fea on snatch force
  • wire holes in recovery bay
  • Split the recovery bay box into walls 

COTS Avionics: Louis Fleisher (RIT Student) 

  • finish power budget with Jim
  • pick antenna and batteries (big ass battery)
  • Pick big batteries with 2 flight computers (scrap will be able to replace a flight computer if we don't have room)

Scrap: Jim Heaney (RIT Student) 

  • Rough power budget including motor to Louis
  • footprint for CAD
  • Have schematic done end of the break