Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
AV Bay: Jonah Gimmi (RIT Student) Mary Dertinger (RIT Student) Riley Quinn (RIT Student) 
  •  Confirm Big Red Bee Size 
  •  Finish layout of bay
  • Nothing much put planning
  • CAD 77cm antenna Hayden
  • Finish layout of bay 3 versions by Saturday Mary, Riley, Jonah
  • Review layout on Saturday with group

Airbrake: Grace Dertinger (RIT Alumni) 
  •  Bushing holes for press fit
  •  Double check airbrake design and fitting
  •  Fix motor to mid plate (hole in front of the motor)
Nothing
  •  Bushing holes for press fit Grace
  •  Double check airbrake design and fitting Grace
  •  Fix motor to mid plate (hole in front of the motor) Grace
  •  Weights Grace/Riley

Recovery: Grace Dertinger (RIT Alumni) Hayden Quinn (RIT Student) 
  •  Pick out chute
  •  Snatch force
  •  Where to reef the chute
  •  FEA on snatch force
  •  Wire holes in recovery bay
  •  Split the recovery bay box into walls 
  • Picked out chute its 4ft 
  • Snatch force of 1450 N for FEA
  •  Where to reef the chute Hayden/Grace
  •  FEA on snatch force Hayden/Riley/Grace
  •  Wire holes in recovery bay Hayden 
  •  Split the recovery bay box into walls  Hayden

COTS Avionics: Louis Fleisher (RIT Student) 
  •  Keep BOM up to date

  • Make sure battery is in stock
Blocked by size 
SCRAP: Jim Heaney (RIT Student)
  •  Continue
workin
  • working on SCRAP
  • Schematic is mostly done 
  • Load cell filtering and data collection
  • Finish up schematic in one week

Other