Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Structures
  •  doing PLA mold with coating and implementing a coupler shoulder 
  •  Change mold file 
  •  Start printing mold
  •  wind booster

Avionics
  •  Wiring Harness
  •  schematic and layout complete first 3 weeks of classes (BP)
  •  master to do lists made for backplane 
  •  need to use dsubs again 
  •  Finish schematics
  •  start review
  •  start layouts
  •  waiting for breakout boards
  •  skill issue
Payload
  •  Check with Grace about accuracy and completeness of CAD
  •  schematic 90% done for SCRAP
  •  finishing CAD Sat. 
  •  Schematics done in week or 2
  •  change code to basic arduino - worse code but no skill issue (Jim and Aaron decision)
  •  Figure out software
  •  finish schematic
  •  finalize CAD

Analysis
  •  RasAero walkthrough in first few weeks
  •  Tech Paper summaries
  •  ANSYS
  •  Payload FEA 
  •  need to fill out application for ANSYS
  •  Payload FEA 
  •  ANSYS
  •  General 5 min RasAero

Reaction Wheel
  •   
  •  software for motor drivers written
  •   
  •  Finalize test bed rocket design
  •  drivers for encoder control code 
  •  further integration

Recovery

Break Action Items:

  •  make sure all components arrive
  •   Determine preliminary layout
  •  Conduct tender descender test
  •  Update OR recovery component weights
  •  Locate viable flame blanket
  •  Begin FDR slides
  •  Figure out where the rocketman order went with Louis Fleisher (RIT Student) 
  •  Figure out where I can test tender descenders
  •  Start testing tender descenders
  • Not knowing things
Other:
Video challenge work

...