Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
---|
Structures | | - doing PLA mold with coating and implementing a coupler shoulder
| - Change mold file
- Start printing mold
- wind booster
|
|
Avionics | - Wiring Harness
- schematic and layout complete first 3 weeks of classes (BP)
| - master to do lists made for backplane
- need to use dsubs again
| - Finish schematics
- start review
- start layouts
| - waiting for breakout boards
- skill issue
|
Payload | - Check with Grace about accuracy and completeness of CAD
- schematic 90% done for SCRAP
| - finishing CAD Sat.
- Schematics done in week or 2
- change code to basic arduino - worse code but no skill issue (Jim and Aaron decision)
| - Figure out software
- finish schematic
- finalize CAD
|
|
Analysis | - RasAero walkthrough in first few weeks
- Tech Paper summaries
- ANSYS
- Payload FEA
| - need to fill out application for ANSYS
| - Payload FEA
- ANSYS
- General 5 min RasAero
|
|
Reaction Wheel | | - software for motor drivers written
-
| - Finalize test bed rocket design
- drivers for encoder control code
- further integration
|
|
Recovery |
| Break Action Items: - make sure all components arrive
- Determine preliminary layout
- Conduct tender descender test
- Update OR recovery component weights
- Locate viable flame blanket
- Begin FDR slides
| - Figure out where the rocketman order went with Louis Fleisher (RIT Student)
- Figure out where I can test tender descenders
- Start testing tender descenders
| |
Other: |
| Video challenge work |
|
|