Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Structures
  •  cut fins
  •  nose cone mold
  •  need CF sheets
  •   need bulkheads for testing (enough material)
  •  fix xwinder
  •   first coat of epoxy on the booster 
  •  
  •   sand and additional coat on tube
  •  order 3 yds of CF from composite envisions 
  •  search for dragonplates
  •  Alex Durand (RIT Student) layup logistics

Avionics
  •  get schematics ready for layout next week
  •  start testing RRC3s
  •  getting LCD screens for RRC3 testing
  •  bought antenna stuff
  •  
  •  Figure out wires and connectors and order them
  •  LCD screens

Payload

  •  finish CAD
  •  AV bay review
  •  figure out recovery**



Analysis
  •  make 5 min training
  •  Payload FEA



Reaction Wheel
  •  add battery and kill switch
  •  Iron out L1 details



Recovery
  • Figured out what was up with the rocketman order
  • Should be on the way, here in ~2 weeks
  •  Prep TD-2 for testing
  •  Test TD-2
  •  Wait for rockeyman

Other: