2/2/2023

Insert timeline:


Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Structures
  • cut fins
  • nose cone mold
  • need CF sheets
  •  need bulkheads for testing (enough material)
  • fix xwinder
  •  first coat of epoxy on the booster 
  •  
  •  sand and additional coat on tube
  • order 3 yds of CF from composite envisions 
  • search for dragonplates
  • Alex Durand (RIT Student) layup logistics

Avionics
  • get schematics ready for layout next week
  • start testing RRC3s
  • getting LCD screens for RRC3 testing
  • bought antenna stuff
  •  backplane: 
  • Figure out wires and connectors and order them
  • schematics done sat start layups
  • Feb 11th checkpoint
  • Feb 18th final layouts 
  • LCD screens

Payload

  • finish CAD
  • AV bay review
  • figure out recovery**
  • AV layed out - figure out mounting
  • airbrake CAD 
  • CAD finished this weekend
  •  

Analysis
  • make 5 min training
  • Payload FEA



Reaction Wheel
  • add battery and kill switch
  • Iron out L1 details



Recovery
  • Figured out what was up with the rocketman order
    • Should be on the way, here in ~2 weeks
  • Read through TD-2 documentation
  • Prep TD-2 for testing
  • Test TD-2
  • Wait for rockeyman

Other: