Insert timeline:

 

Sub team

Last Week Action Items

Weekly Update

Action Items

Blockers

Sub team

Last Week Action Items

Weekly Update

Action Items

Blockers

Structures

cut fins
nose cone mold
need CF sheets
 need bulkheads for testing (enough material)
fix xwinder
 first coat of epoxy on the booster 
 
 sand and additional coat on tube
order 3 yds of CF from composite envisions 
search for dragonplates
@Alex Durand (RIT Student) layup logistics

 

Avionics

get schematics ready for layout next week
start testing RRC3s
getting LCD screens for RRC3 testing
bought antenna stuff
 backplane: 
Figure out wires and connectors and order them
schematics done sat start layups
Feb 11th checkpoint
Feb 18th final layouts 
LCD screens

Payload

finish CAD
AV bay review
figure out recovery**
AV layed out - figure out mounting
airbrake CAD 
CAD finished this weekend

 

Analysis

make 5 min training
Payload FEA

 

 

 

Reaction Wheel

add battery and kill switch
Iron out L1 details

 

 

 

Recovery

 

  • Figured out what was up with the rocketman order

    • Should be on the way, here in ~2 weeks

  • Read through TD-2 documentation

Prep TD-2 for testing

Test TD-2
Wait for rockeyman

 