2/2/2023
Insert timeline:
Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
|---|---|---|---|---|
Structures | cut fins nose cone mold need CF sheets need bulkheads for testing (enough material) fix xwinder | first coat of epoxy on the booster | sand and additional coat on tube order 3 yds of CF from composite envisions search for dragonplates @Alex Durand (RIT Student) layup logistics |
|
Avionics | get schematics ready for layout next week start testing RRC3s | getting LCD screens for RRC3 testing bought antenna stuff backplane: | Figure out wires and connectors and order them schematics done sat start layups Feb 11th checkpoint Feb 18th final layouts | LCD screens |
Payload | finish CAD AV bay review figure out recovery** | AV layed out - figure out mounting airbrake CAD | CAD finished this weekend |
|
Analysis | make 5 min training Payload FEA |
|
|
|
Reaction Wheel | add battery and kill switch Iron out L1 details |
|
|
|
Recovery |
|
| Prep TD-2 for testing Test TD-2 Wait for rockeyman |
|
Other: |
|
|
|
|