Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Overall
  •   
  •  FDR slides due end of Saturday 
  •  Progress Report due tomorrow 
  •  fins thicker
  •  Schedule run-throughs


Structures:
  •  another layer of epoxy on tube
  •  Brainstorming session on nose cone
  •  Finish CAD
  •  Work on FDR
  •  Work on Progress Report
  •  2 bulkheads complete
  •  check basement for thrust plate stock
  •  order more stock
  •  Alex Speyer (RIT Student) call dragonplate
  •  Grace Dertinger (RIT Alumni) email carter about bulkhead test
  •  tube layer needs some work
  •  meeting with Vic Sat for nose cone pointers
  •  called dragonplate - gonna call again, not looking good
  •  Need to sand another and add another layer 
  •  figure out mold 

Avionics
  •  Define antenna placement
  •  Define vent holes
  •  Order wires and connectors
  •  BRB battery test
  •  shit hits the fan if you fully drain
  •  buying bigger battery
  •  wire arrived
  •  ordered DE9 
  •  get new battery that lasts 40 hrs
  •  antenna placement
  •  order screw switches and batteries
  •  order delrin adhesive 

Backplane
  •  Finalize layout schematics
  •  finding minor issues on schematics
  •  layout review saturday
  •  2 weeks out from ordering
  •  layout review
  •  order wiznet breakouts

Payload
  •  Mount Scrap with hardware/holes then double check with Jim Jonah
  •  Mount flight computer with hardware/holes Riley
  •  Battery mounts Hayden
  •  Make sure we have access to screw switches Josh
  •  Order hardware Grace/Louis @Louis Fleisher (lff8659)
  •  Stock in basement Grace
  •  Look into making our own chute bag Jonah/Louis/Leo/Josh
  •  Sew chute bag 
  •  Look into reefing Leo
  •  FEA on snatch force check Leo/Jonah/Hayden/Riley for training
  •  Order Screw Switches (buy from Florida) Louis
  •  Have avionics team check schematic/layout of scrap this Sunday Jim
  •  Edit scrap from feedback Jim
  •  Final battery connector check Jim
  •  order Louis
  •  send stuff to send cut send
  •  order batteries
  •   
  •  BRB wont fit - change orientation 90 deg.
  •  changed width of plates in payload
  •  finish CAD 
  •  order antenna things
  •  verify BRB dimensions.

Analysis
  •  Update RASAero
  •  Update current openrocket to newer openrocket
  •  Document CD simulation/process
  •  RasAero updated 
  •  OR updated
  •  
  •  FDR slides 
  •  test plan on progress report

Recovery
  •  Get some ematches through any means necessary
  •  Test TD-2
  •  Continue waiting for my lover rocketman to return from war with my parachutes
  •  Did tech report content
  •  Tested TD-2 (VERY dramatic)
  •  Started FDR slides
  •  Realized need for more ematches & 4F BP
  •  Order more ematches
  •  Order 4F BP
  •  Continue waiting for rocketman order :(((((((
  •  Test other 2 TD-2s (once I have ematches)
  •  Finish FDR slides
  •  Waiting for rocketman order & ematch order
Other:
  •  DRIs look at Openrocket 
  •  Alex Speyer (RIT Student) call dragonplate
  •  write video challenge script once music is set
  •  Reach out to CAB (Holly Files) about fundraising ideas?



...