Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
---|
Overall | | - FDR slides due end of Saturday
- Progress Report due tomorrow
- fins thicker
| |
|
Structures: | - another layer of epoxy on tube
- Brainstorming session on nose cone
- Finish CAD
- Work on FDR
- Work on Progress Report
- 2 bulkheads complete
- check basement for thrust plate stock
- order more stock
- Alex Speyer (RIT Student) call dragonplate
- Grace Dertinger (RIT Alumni) email carter about bulkhead test
| - tube layer needs some work
- meeting with Vic Sat for nose cone pointers
- called dragonplate - gonna call again, not looking good
| - Need to sand another and add another layer
- figure out mold
|
|
Avionics | - Define antenna placement
- Define vent holes
- Order wires and connectors
| - BRB battery test
- shit hits the fan if you fully drain
- buying bigger battery
- wire arrived
- ordered DE9
| - get new battery that lasts 40 hrs
- antenna placement
- order screw switches and batteries
- order delrin adhesive
|
|
Backplane | - Finalize layout schematics
| - finding minor issues on schematics
- layout review saturday
- 2 weeks out from ordering
| - layout review
- order wiznet breakouts
|
|
Payload | - Mount Scrap with hardware/holes then double check with Jim Jonah
- Mount flight computer with hardware/holes Riley
- Battery mounts Hayden
- Make sure we have access to screw switches Josh
- Order hardware Grace/Louis @Louis Fleisher (lff8659)
- Stock in basement Grace
- Look into making our own chute bag Jonah/Louis/Leo/Josh
- Sew chute bag
- Look into reefing Leo
- FEA on snatch force check Leo/Jonah/Hayden/Riley for training
- Order Screw Switches (buy from Florida) Louis
- Have avionics team check schematic/layout of scrap this Sunday Jim
- Edit scrap from feedback Jim
- Final battery connector check Jim
- order Louis
- send stuff to send cut send
- order batteries
-
| - BRB wont fit - change orientation 90 deg.
- changed width of plates in payload
| - finish CAD
- order antenna things
- verify BRB dimensions.
|
|
Analysis | - Update RASAero
- Update current openrocket to newer openrocket
- Document CD simulation/process
| - RasAero updated
- OR updated
-
| - FDR slides
- test plan on progress report
|
|
Recovery | - Get some ematches through any means necessary
- Test TD-2
- Continue waiting for my lover rocketman to return from war with my parachutes
| - Did tech report content
- Tested TD-2 (VERY dramatic)
- Started FDR slides
- Realized need for more ematches & 4F BP
| - Order more ematches
- Order 4F BP
- Continue waiting for rocketman order :(((((((
- Test other 2 TD-2s (once I have ematches)
- Finish FDR slides
| - Waiting for rocketman order & ematch order
|
Other: | - DRIs look at Openrocket
- Alex Speyer (RIT Student) call dragonplate
- write video challenge script once music is set
- Reach out to CAB (Holly Files) about fundraising ideas?
|
|
|
|