2/16/2023

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

2/16/2023

Insert timeline:

 

Sub team

Last Week Action Items

Weekly Update

Action Items

Blockers

Sub team

Last Week Action Items

Weekly Update

Action Items

Blockers

Overall

 
FDR slides due end of Saturday 
Progress Report due tomorrow 
fins thicker
Schedule run-throughs

 

Structures:

another layer of epoxy on tube
Brainstorming session on nose cone
Finish CAD
Work on FDR
Work on Progress Report
2 bulkheads complete
check basement for thrust plate stock
order more stock
@Alex Speyer (RIT Student) call dragonplate
@Grace Dertinger (RIT Alumni) email carter about bulkhead test
tube layer needs some work
meeting with Vic Sat for nose cone pointers
called dragonplate - gonna call again, not looking good
Need to sand another and add another layer 
figure out mold 

 

Avionics

Define antenna placement
Define vent holes
Order wires and connectors
BRB battery test
shit hits the fan if you fully drain
buying bigger battery
wire arrived
ordered DE9 
get new battery that lasts 40 hrs
antenna placement
order screw switches and batteries
order delrin adhesive 

 

Backplane

Finalize layout schematics
finding minor issues on schematics
layout review saturday
2 weeks out from ordering
layout review
order wiznet breakouts

 

Payload

Mount Scrap with hardware/holes then double check with Jim Jonah
Mount flight computer with hardware/holes Riley
Battery mounts Hayden
Make sure we have access to screw switches Josh
Order hardware Grace/Louis @Louis Fleisher (lff8659)
Stock in basement Grace
Look into making our own chute bag Jonah/Louis/Leo/Josh
Sew chute bag 
Look into reefing Leo
FEA on snatch force check Leo/Jonah/Hayden/Riley for training
Order Screw Switches (buy from Florida) Louis
Have avionics team check schematic/layout of scrap this Sunday Jim
Edit scrap from feedback Jim
Final battery connector check Jim
order Louis
send stuff to send cut send
order batteries
 
BRB wont fit - change orientation 90 deg.
changed width of plates in payload
finish CAD 
order antenna things
verify BRB dimensions.

 

Analysis

Update RASAero
Update current openrocket to newer openrocket
Document CD simulation/process
RasAero updated 
OR updated
FDR slides 
test plan on progress report

 

Recovery

Get some ematches through any means necessary
Test TD-2
Continue waiting for my lover rocketman to return from war with my parachutes
Did tech report content

Tested TD-2 (VERY dramatic)
Started FDR slides
Realized need for more ematches & 4F BP
Order more ematches

Order 4F BP
Continue waiting for rocketman order :(((((((
Test other 2 TD-2s (once I have ematches)
Finish FDR slides
Waiting for rocketman order & ematch order

Other:

DRIs look at Openrocket 
@Alex Speyer (RIT Student) call dragonplate
write video challenge script once music is set
Reach out to CAB (Holly Files) about fundraising ideas?