2/16/2023
Insert timeline:
Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
|---|---|---|---|---|
Overall | FDR slides due end of Saturday Progress Report due tomorrow fins thicker | Schedule run-throughs |
| |
Structures: | another layer of epoxy on tube Brainstorming session on nose cone Finish CAD Work on FDR Work on Progress Report 2 bulkheads complete check basement for thrust plate stock order more stock @Alex Speyer (RIT Student) call dragonplate @Grace Dertinger (RIT Alumni) email carter about bulkhead test | tube layer needs some work meeting with Vic Sat for nose cone pointers called dragonplate - gonna call again, not looking good | Need to sand another and add another layer figure out mold |
|
Avionics | Define antenna placement Define vent holes Order wires and connectors | BRB battery test shit hits the fan if you fully drain buying bigger battery wire arrived ordered DE9 | get new battery that lasts 40 hrs antenna placement order screw switches and batteries order delrin adhesive |
|
Backplane | Finalize layout schematics | finding minor issues on schematics layout review saturday 2 weeks out from ordering | layout review order wiznet breakouts |
|
Payload | Mount Scrap with hardware/holes then double check with Jim Jonah Mount flight computer with hardware/holes Riley Battery mounts Hayden Make sure we have access to screw switches Josh Order hardware Grace/Louis @Louis Fleisher (lff8659) Stock in basement Grace Look into making our own chute bag Jonah/Louis/Leo/Josh Sew chute bag Look into reefing Leo FEA on snatch force check Leo/Jonah/Hayden/Riley for training Order Screw Switches (buy from Florida) Louis Have avionics team check schematic/layout of scrap this Sunday Jim Edit scrap from feedback Jim Final battery connector check Jim order Louis send stuff to send cut send order batteries | BRB wont fit - change orientation 90 deg. changed width of plates in payload | finish CAD order antenna things verify BRB dimensions. |
|
Analysis | Update RASAero Update current openrocket to newer openrocket Document CD simulation/process | RasAero updated OR updated | FDR slides test plan on progress report |
|
Recovery | Get some ematches through any means necessary Test TD-2 Continue waiting for my lover rocketman to return from war with my parachutes | Did tech report content Tested TD-2 (VERY dramatic) Started FDR slides Realized need for more ematches & 4F BP | Order more ematches Order 4F BP Continue waiting for rocketman order :((((((( Test other 2 TD-2s (once I have ematches) Finish FDR slides | Waiting for rocketman order & ematch order |
Other: | DRIs look at Openrocket @Alex Speyer (RIT Student) call dragonplate write video challenge script once music is set Reach out to CAB (Holly Files) about fundraising ideas? |
|
|
|