Overall
  •  
  • FDR slides due end of Saturday 
  • Progress Report due tomorrow 
  • fins thicker
  • Schedule run-throughs


Structures:
  • another layer of epoxy on tube
  • Brainstorming session on nose cone
  • Finish CAD
  • Work on FDR
  • Work on Progress Report
  • 2 bulkheads complete
  • check basement for thrust plate stock
  • order more stock
  • Alex Speyer (RIT Student) call dragonplate
  • Grace Dertinger (RIT Alumni) email carter about bulkhead test
  • tube layer needs some work
  • meeting with Vic Sat for nose cone pointers
  • called dragonplate - gonna call again, not looking good
  • Need to sand another and add another layer 
  • figure out mold 

Avionics
  • Define antenna placement
  • Define vent holes
  • Order wires and connectors
  • BRB battery test
  • shit hits the fan if you fully drain
  • buying bigger battery
  • wire arrived
  • ordered DE9 
  • get new battery that lasts 40 hrs
  • antenna placement
  • order screw switches and batteries
  • order delrin adhesive 

Backplane
  • Finalize layout schematics
  • finding minor issues on schematics
  • layout review saturday
  • 2 weeks out from ordering
  • layout review
  • order wiznet breakouts

Payload
  • Mount Scrap with hardware/holes then double check with Jim Jonah
  • Mount flight computer with hardware/holes Riley
  • Battery mounts Hayden
  • Make sure we have access to screw switches Josh
  • Order hardware Grace/Louis @Louis Fleisher (lff8659)
  • Stock in basement Grace
  • Look into making our own chute bag Jonah/Louis/Leo/Josh
  • Sew chute bag 
  • Look into reefing Leo
  • FEA on snatch force check Leo/Jonah/Hayden/Riley for training
  • Order Screw Switches (buy from Florida) Louis
  • Have avionics team check schematic/layout of scrap this Sunday Jim
  • Edit scrap from feedback Jim
  • Final battery connector check Jim
  • order Louis
  • send stuff to send cut send
  • order batteries
  •  
  • BRB wont fit - change orientation 90 deg.
  • changed width of plates in payload
  • finish CAD 
  • order antenna things
  • verify BRB dimensions.

Analysis
  • Update RASAero
  • Update current openrocket to newer openrocket
  • Document CD simulation/process
  • RasAero updated 
  • OR updated
  •  
  • FDR slides 
  • test plan on progress report

Recovery
  • Get some ematches through any means necessary
  • Test TD-2
  • Continue waiting for my lover rocketman to return from war with my parachutes
  • Did tech report content
  • Tested TD-2 (VERY dramatic)
  • Started FDR slides
  • Realized need for more ematches & 4F BP
  • Order more ematches
  • Order 4F BP
  • Continue waiting for rocketman order :(((((((
  • Test other 2 TD-2s (once I have ematches)
  • Finish FDR slides
  • Waiting for rocketman order & ematch order
Other:
  • DRIs look at Openrocket 
  • Alex Speyer (RIT Student) call dragonplate
  • write video challenge script once music is set
  • Reach out to CAB (Holly Files) about fundraising ideas?