Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Structures
  •  upper bulkhead 
  •  nose cone mold
  •  nose cone layup
  •  cut airframe
  •  3d print fin support ring
  •  machine nose cone tip
  •  machine nose cone bulkhead
  •  machine fin support bars
  •  assemble fin/boat tail assembly
  •  cut centering rings
  •  order motor tube
  •  assembly booster
  •  insert keying geometry
  •  machine charge caps
  •  drill mounting/vent holes
  •   James make fins
  •   layup nose cone
  •  finish Al parts
  •  Cut tubes
  •  cut fin slots
  •  assemble booster
  •  fin rounding - look into making a jig that attaches to the belt sander
  •  manpower
  •  tube cutting
Avionics
  •  Test pressure sensing for RRC3s
  •  Find/Buy more Baofeng chargers
  •  Charge Baofengs
  •  Test BRB battery 
  •  cook
  •  Play DOOM on the ground station (train avi people going to IREC)
  •  finishing layout of av bay
  •  route and laser cut av bay 
  •  pressure test RRC3
  •  charge baofengs
  •  test BRB battery
  •  purchase backups 

Backplane
  •  everything ready to be ordered except for power mod 
  •  ORDER SHIT

Recovery
  •  Ematch party (my parents aren't home)
  •  Put the other two TD-2s together, and then take them apart explosively

  •  TD testing

Payload



Other:

HAM exam April 15th on campus