3/30/2023

Insert timeline:


Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Structures
  • upper bulkhead 
  • nose cone mold
  • nose cone layup
  • cut airframe
  • 3d print fin support ring
  • machine nose cone tip
  • machine nose cone bulkhead
  • machine fin support bars
  • assemble fin/boat tail assembly
  • cut centering rings
  • order motor tube
  • assembly booster
  • insert keying geometry
  • machine charge caps
  • drill mounting/vent holes
  •  James make fins
  •  layup nose cone
  • finish Al parts
  • Cut tubes
  • cut fin slots
  • assemble booster
  • fin rounding - look into making a jig that attaches to the belt sander
  • manpower
  • tube cutting
Avionics
  • Test pressure sensing for RRC3s
  • Find/Buy more Baofeng chargers
  • Charge Baofengs
  • Test BRB battery 
  • cook
  • Play DOOM on the ground station (train avi people going to IREC)
  • finishing layout of av bay
  • route and laser cut av bay 
  • pressure test RRC3
  • charge baofengs
  • test BRB battery
  • purchase backups 

Backplane
  • everything ready to be ordered except for power mod 
  • ORDER SHIT

Recovery
  • Ematch party (my parents aren't home)
  • Put the other two TD-2s together, and then take them apart explosively

  • TD testing

Payload



Other:

HAM exam April 15th on campus