This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.
3/30/2023
Insert timeline:
Sub team | Last Week Action Items | Weekly Update | Action Items | Blockers |
|---|---|---|---|---|
Structures | upper bulkhead nose cone mold nose cone layup cut airframe 3d print fin support ring machine nose cone tip machine nose cone bulkhead machine fin support bars assemble fin/boat tail assembly cut centering rings order motor tube assembly booster insert keying geometry machine charge caps drill mounting/vent holes | James make fins | layup nose cone finish Al parts Cut tubes cut fin slots assemble booster fin rounding - look into making a jig that attaches to the belt sander | manpower tube cutting |
Avionics | Test pressure sensing for RRC3s Find/Buy more Baofeng chargers Charge Baofengs Test BRB battery cook Play DOOM on the ground station (train avi people going to IREC) | finishing layout of av bay | route and laser cut av bay pressure test RRC3 charge baofengs test BRB battery purchase backups |
|
Backplane |
| everything ready to be ordered except for power mod | ORDER SHIT |
|
Recovery | Ematch party (my parents aren't home) Put the other two TD-2s together, and then take them apart explosively |
| TD testing |
|
Payload |
|
|
|
|
Other: |
|
| HAM exam April 15th on campus |
|