Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

SubteamAction ItemsFurther Action ItemsFUrther Further action itesm
Structures
  •  Finish nose cone
    •  bondo
    •  sand
    •  poly
  •  drill holes
    •  need jig for payload
    •  vent holes in parachute bay
    •  shear pins
    •  vent holes in av bay
    •  screw holes for couplers
  •  fix tip
  •  keying tabs
  •  stability analysis
  •  Drill payload holes
  •  drill vent holes
  •  drill screw holes
  •  drill shear pin holes
  •  prime nose cone
  •  reweigh EVERYthing
  •  (smile) 
  •  Weigh everything
  •  tape off all holes and aluminum for paint
  •  screws in nosecone and tape off
  •  get Alex RGB code 
  •  get rocket painted 
  •  keying geometry for Av Bay
  •  packing list
  •  tech report
Avionics
  •  get new connectors for BRB battery
  •  make connectors
  •  make wiring harness
  •  vacuum test avionics
  •  cut av bay
    •  route delrin end caps
    •  laser support bars
    •  test brackets for batteries and connect
    •  print screw switch brackets 
    •  print backplane battery bracker
    •  integration guide
  •  order tamiya
  •  Get FRS radio
  •  Recut COTS sled
  •  Cut key
  •  Design and print PROMPT mount
  •  Vacuum test
  •  Design and print d-sub bracket
  •  Set pinout
  •  Bridge breakouts
  •  Recut COTS sled
  •  strain relief bracket (dsubs)
  •  debur, sand, and glue bay
  •  keying geometry 
  •  test prompt mount
  •  RRC3 battery test
  •  integration testing, practice
  •  edit last years procedure and improve
  •  packing list
Backplane
  •  fix radio module
  •  order power module
  •  putting altimeter in place of backplane
  •  need weight for test launch 
  •  flying the battery for backplane
  •  Testing RFM range at test launch 
  •  RFM code
  •  Design and cut small altimeter sled
  •  waiting for parts
  •  dead mass for test flight
  •  modules in
  •  modules need to be assembled 
  •  figure out antenna splitter situation
  •  Range test RFM
Payload
  •  Av bay
    •  BRB needs standoffs and mount
    •  Print SABOT
    •  print FC mount and add heat inserts
    •  print battery mount and mount x2
    •  print scrap mount and mount
    •  make dummy scrap with ultralogger -Jim
    •  3D print screw switch mount
    •  tap support bar
    •  3D print antenna clips
    •  reduce weight in chute bay
    •  Assemble and wire COTS Av -Louis
    •  Write procedures
  •  Print sabot
  •  reprint scrap mount
  •  hole jig
  •  integrate new BRB battery 
    •  make new mount
    •  Reintegrate other battery
  •  integration procedures
  •  Reprint sabot
  •  print final scrap mount
  •  Integrate BRB Battery
  •  write procedure
  •  payload 2 being machined 
  •  weld payload 2 bay
  •  test electronics and recovery this weekend
  •  do software 
  •  test load calls and payload opening/closing
  •  talk to consultant James about recovery
Recovery
  •  Deployment testing Thursday night 
  •  Assemble recovery harness
  •  test remaining TD-2s
  •  Main parachute bag test
    •  how easy does it stay in there?
    •  how easy does it pull out
  •  Write and PRACTICE integration procedures 
  •  Figure out stringing 
  •   
  •  Deployment testing
  •  finish procedures
  •  main pull testing 
Poster

done
Test Flight

Pros

Cons
Other

...