Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

grind time


  •  Avionics bay
    •  BigRedBee mounted
    •  Bridge wires connected
    •  Continuity check
    •  Assemble/attach sleds
  •  Charge wires
    •  Epoxy into bulkheads
      •  Drogue
      •  Main
    •  Check continuity
    •  Verify color map is correct
  •  Payload
    •  Remove rust
    •  Fully assemble
    •  Pack parachute
    •  Label sabot leave holes