Avionics TODO
Avionics TODO
grind time
- Avionics bay
- BigRedBee mounted
- Bridge wires connected
- Continuity check
- Assemble/attach sleds
- Charge wires
- Epoxy into bulkheads
- Drogue
- Main
- Check continuity
- Verify color map is correct
- Epoxy into bulkheads
- Payload
- Remove rust
- Fully assemble
- Pack parachute
- Label sabot leave holes
- Remove rust