Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

TimeItemWhoNotes




Action items

General

Last week

This week

  •  poster tomorrow
  •  Tech report due May 13th or 15
  •  Last update 22nd
  •  OR confirm

Next week

  •  

Structures

Last Week

  •  FDR
  •  Start sanding tubes
  •  1 bulkhead finished
  •  If fiberglass is here then layup nose cone
  •  Cut tubes to length
  •  redo bulkhead FEA 
  •  Research into layups for learning
  •   

This week

  •  Machine bulkhead x2Bulkheads
  •  Sand tubes to length
  •  explore nose cone lay up options
  •  Look into fin stabilizing options
  •  Fin can CAD
  •  Finish tubes with epoxy layer 
  •  Publish schedule
  •  edit action items list
  •  confirm OR stuff
  •  Finalize masses 
  •  explore nose cone lay up options Jake Halpern (RIT Student) 
  •  Look into fin stabilizing options Nathan Aquilio (RIT Student) 
  •  Make new nose cone
  •  Cut fins
  •  Fin can 3d print
  •  FIN CAN DONE
  •  Fin machine rectangles

This week

  •  Bulkhead holes for avionics
  •  cut fin slots in booster
  •  TOTALLY finish the tube surfaces
  •  All tubes fit together
  •  nose cone fit 
  •  confirm OR stuff 
  •  Finalize masses (make sure we get 5lbs)

Next week

  •   IREC 101
  •   Paint
  •  everything else tbh


Payload

Last week

  •  Making parashot bay
  •  Darwin progress- joe approved/redesign 
  •  Order part with approval
  •  FDR SLIDEs IN
  •   Payload lid machined
  •  Welding parashot bay
  •  Assemble Darwin
  •  Waiting on Darwin and screw switches

This week

  •  Continue on parashot bay Assemble more Darwin
  •  General GS stuff
  •    wire screw switches

Next week

  •   Continue Darwin  And loose end stuff
  •  General GS stuff
  •  deployment testing eventually


Avionics

Last week

  •  Order ave bay parts
  •  FDR SLIDES IN
  •  Waiting for FG tube
  •  All flying electronics are in
  •  Parts sent to matt for print
  •  Xbee module Worked on

This week

  •  Xbee module Worked onwaiting antenna 
  •  find more cables
  •  MS561 barometer/temp sensor worked on (sad)
  •   finishing up ave bay cad

Next week

  •  Assembly of bay
  •  Vacuum test flight computers
  •  MS561 barometer/temp sensor worked on
  • (waiting for whole bay)


Umbilical

Last week

  •  Finished review of files, prepped for manufacturing
  •  Components ordered
  •  Print aerodynamic shell
  •   

This week

  •   PCBs sent for manufacturing
  •  Components ordered
  •  Print aerodynamic shell
  • Wait for components to arrive

Next week

  •   Wait for components to arrive/assembly

Recovery

Last week

  •  Order stuffEnjoy Spring Break

This week

  •  Organize all ordered components
  •  Order /locate swivel links
  •  Locate quick links
  •  Enjoy Spring BreakOrder new shock cord as per IREC email

Next week

  •  Start assembling
  •  Start cutting


Prop

Last week 

  •    motor bought 

This week

  •  Pick motor
  •  Discuss where to purchase motor
  • get motor at comp

Next week

...