Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: |
---|
Assign tasks to people/groups. |
| 1/28/22 | Ongoing | Ongoing | We need to get groups working on specific action items. |
CAD Entire Rocket |
| 1/29/22 | ASAP |
| Teams need to work together to get this together. |
Add and Highlight BOM Parts to Order |
| 1/29/22 | Ongoing | Ongoing | Confirm parts with group, Domenic, and highlight |
We Need Money Guys. | Search your couch cushions, sell your belongings, beg on the street. | 1/29/22 | Ongoing | Ongoing | $$$$$$$. Don't sell your kidney. You might need that. |
Avionics Bay Sled | Determine materials, Order materials, 3D print/laser cut, assemble/glue | 1/24/22 | 3/5/22 |
| Avionics group should finalize details and CAD soon. |
Make parts |
Finalize Motor for Air brakes and order it | Re-simulate motor and selection | 1/24/22 | 2/05/22 |
|
|
Order Avionics | N/A | 1/24/22 | ASAP |
| Proton 2x, Batteries, transmitter etc. see BOM |
Order & finalize parachute, eyebolts, shockcord, streamer |
Attach CAD, Calculate chute size, attach streamer | 1/28/22 | 3/5/22 |
| Structures team needs to figure out the parachute size needed and find a best fit for the rocket. |
Solder |
Protons and Transmitter boardAvionics boards | Very carefully solder connections to boards | 1/28/22 | 3/5/22 |
| BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... |
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing |
|
|
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing |
| Do not directly connect source and ground. You will have a bad time. Decide on how we are going to secure everything within the av bay. |
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts |
|
|
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 | ASAP |
Install Motor next to airbrakes | Align correctly. | 1/28/22 | End of Av Bay ManufacturingN/A |
|
|
Finalize materials needed for air break | Finalize parts list and stock. Put needed things in BOM | 1/28/22 | ASAP |
Order materials for air break | Rods/ lead screws | CAD, find what is needed ^ | 1/ |
2822CAD/Manufacture air break | N/AASAP | Highlight the items | CAD ASAP |
|
|
Motor attachment to air break | Figure it out, CAD, assembly/install^ | 1/ |
28N/A3/20/22 | Airbrake group is on this | Manufacture Thrust Plate | CAD ASAP |
|
|
Order materials for air break | N/A^ | 1/28/22 |
3/20/22 | Structures on this | Cut and Glue Fins | N/A | ASAP |
| Highlight the items |
Manufacture air break | CAD and Manufacture | 1/28/22 | CAD ASAP 3/20/22 |
Structures Produce parts and assembly
| Airbrake group is on this |
Make and wire up black powder charges | We need to first determine the materials we need to make this. | 1/28/22 | Before we close up the rocket |
| We should find someone who knows how to do this. |
Build Camera stabilizing system | Get switch for avionics system | We also need to install it . | 1/28/22 | 3/5/22 |
Camera group | Make parts for engineering camera system | Print/cut | 1/28/22 | |
| What switch is being used? |
Nose Cone | Make and glue bulkhead, order part | 1/29/22 | 3/5/22 |
|
|
Four Plywood Bulkheads | CAD, order stock, cut, epoxy to tubes, FEA on top bulkhead | 1/29/22 | CAD ASAP 3/5/22 |
Camera group | Wire up camera systems | N/A | 1/28/22 | 3/20/22 | Camera group with help of avionics if needed | Get switch for avionics system | We also need to install it . | 1/28/22 | 3/5/22 | What switch is being used? | Nose Cone | Make and glue bulkhead, order partCAD, order stock, epoxy to tubes, FEA on top bulkhead | 2/5/2022
|
|
Look into avionics alternatives | Substitute Eggtimer parts | 1/29/22 | ASAP |
|
|
Update wiring diagram | N/A | 1/29/22 | ASAP |
| Update with new parts as needed |
Airbreak Calculations | FEA, Assembly, joints, snatch force | 1/29/22 | ASAP |
|
|
Assemble "All or nothing" parachute system |
| 1/29/22 | 3/5/22 |
|
|
Chute Bulkhead | CAD, FEA, I bolts, order stock, manufacture, epoxy to tubes | 1/29/22 | CAD ASAP 3/5/22 | 2/5/2022 |
|
Camera Bulkhead | CAD, FEA, determine size, order stock, manufacture, mount camera | 1/29/22 | CAD ASAP 3/5/22 |
|
|
Mount Camera to bulkhead | ^ | 1/29/22 | 3/5/22 |
|
|
Set Screw or L bracket into rods for AV Bay placement | Determine how its going to work, CAD, order parts, attach | 1/29/22 | CAD ASAP 3/5/22 |
|
|
Make jig for air break? |
| 1/29/22 |
|
|
|
Airbreak Webbing | CAD, Order, "Gromit" it to airbreak | 1/29/22 |
|
| Button head screw, "Gromit", Washers |
CAD and print jig for cutting blue tube |
| 1/29/22 | ASAP |
| For airbreaks |
Figure out Airbrake Assembly order and integration |
| 1/29/22 | ASAP |
|
|
CAD and 3D Print Engineering Camera Casing | CAD Integration and 3D print | 1/29/22 | CAD ASAP 3/5/22 |
|
|
Order parts for engineering camera |
| 1/29/22 | ASAP |
|
|
Make jig and cut blue tube | Cut blue tube for engineering camera | 1/29/22 | 3/5/22 |
Bulkheads | Manufacture Engineering Camera system | Wire up, install, epoxy | 1/29/22 | 3/5/22 |
Look into avionics alternatives |
|
|
CAD Scenic Camera | CAD and integrate CAD into rocket | 1/29/22 | ASAP |
|
|
Order parts for scenic camera |
| 1/29/22 | ASAP |
Update wiring diagram |
|
|
Manufacture Parts for scenic camera |
| 1/29/22 | 3/5/22 |
|
|
Assemble scenic camera |
| 1/29/22 |
|
|
|
Fins CAD | Have CADed fins in model | 1/29/22 | CAD ASAP |
Airbreak Calculations | FEA, Assembly, joints |
|
|
Order stock and manufacture fins | Send to "Send cut send" | 1/29/22 |
|
|
|
Attach Fins |
| 1/29/22 |
|
|
|
Calculations FEA for motor |
| 1/29/22 |
|
| Done? |
CAD/Assembly for Rocket Motor |
| 1/29/22 | CAD ASAP |
| Assembly for everything rocket motor |
Manufacture thrust plate | Order stock and cut | 1/29/22 | 3/5/22 |
|
|
Order stock for Rocket Motor |
| 1/29/22 |
|
|
|
Set Up the Scenic Camera | No manufacturing | 2/19/22 | 2/19/22 |
| Donovan's gonna do it |
Have Fun | idk | -∞ | ∞ | ∞ | Get to work |