Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


Discussion items

ItemNotes
 Review Action Items
 CAD Overview

 Yevgeniy Gorbachev (RIT Student) Billy Siegener (RIT Student) Aaron Chan (RIT Student) Will Merges (RIT Student)

Still to do:

  • battery retention / location
  • side wall mounting
    • recess side posts
  • wiring diagram (high-level)
  • connectors
    • spade connectors for going to recovery section (charges)
      • wire epoxied in plate, female spades crimped to each end
  • connect sleds (intra-sled connections)
    • ribbon cables on top
  • mass looks good
    • estimated ~2300 grams without including side walls, electronics, recovery gear, batteries
  • GPS antenna for BRB
    • BRB on inside, camera board on outside
    • whip and GPS antenna (nay-nay) on outside above camera board
Altium

Action items