Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Task

Assigned 

Comments/Progress/Blockers

Design

  •  CAD



  •  Order


hardware?

Manufacture



  •  Cut off Bottom portion of Nose Cone


Assembly 



  •  Friction fit + retention screws


...

Task

Assigned 

Comments/Progress/Blockers

Design

  •  Length  Cals from OR



  •  Put all CAD components into assy for rocket


  •  CAD



  •  Jig for Slot cutting and Ave bay holes


  •  Order Tubes

hardware?
Manufacture

  •  Holes for Ave Bay (laser cut/Drill?)
Bo Goldenprobably drill
  •  Holes for chutes
Bo Golden
  •  Slot for Fins(laser cut/dremmel?)
Bo Golden
Assembly

  •  Assembly order of everything then slide in/epoxy


...

Task

Assigned 

Comments/Progress/Blockers

Design

  •  CAD



  •  Fin Flutter Calcs


  •  Order/find Fiber Glass stock

Stock changed to carbon fiber

Cutting to be done 04/04

  •  Spacer Jig for epoxy


  •  Ensure slots in Frame are right size and position


Manufacture

  •  CAM

Bo, Sierra, Joshua, Andrew S

  •  Run on Crushinator
GLOVES
Assembly

  •  ORDER of assembly


  •  Epoxy


  •  Slide into airframe slots


...