Construction:

  • Bulkhead located on top of av bay
  • Entire av bay can be pulled out in one piece
  • Need wiring passthroughs for deployments


Order From Nosecone to Tail:

  1. Camera
  2. Switches (RBF)
  3. Sled
    • SPICA board
      • 900 MHz antenna, GPS Patch antenna
    • RCC3 COTS Altimeter
    • Big Red Bee BeeLine GPS
    • Eggtimer
    • Camera battery

Top-Down assembly:

Top Bulkhead

  • Permanently fixed 
  • Secured with rocket epoxy
  • Threaded rods go only halfway through bulkhead and are able to be pulled out
  • Panel mount connected w/ top of cameras for wires to pass through to charges
  • Screws for alignment

Cameras

  • Wires coiled in center
  • more glue
  • Threaded rods screwed into camera bulkhead

RBF

  • Mount from top
  • Threaded rods screwed into RBF bulkhead

Sled

  • Riv-nuts ( ? )
  • batteries all on one side
  • power goes to switches, then down other side to flight computers

Bottom bulkhead

  • removeable w/ square O-ring slot except the O-ring is a quattro 
  • 0.75" thick bulkhead
  • LUBE
  • LOTS AND LOTS OF LUBE
  • screw holes on top of quattro ring
  • one piece with eyebolt (4th axis baybeee!)
  • Threaded rods run through, gets secured with nuts





  • No labels