Semester 2

Important Dates:

March 6-13 Spring Break

April 27 Final Exams Start

Assignee / Action Item / DescriptionManufacturing Steps: Date Assigned:Complete By:Completion Date:Comments:
Assign tasks to people/groups. 
1/28/22Ongoing OngoingWe need to get groups working on specific action items. 
Avionics Bay SledDetermine materials, 3D print/laser cut1/24/223/5/22
Avionics group should finalize details and CAD soon. 
Finalize Motor for Air brakesN/A1/24/221/31/221/28/22Use motor in BOM assuming airbrakes is still okay with it. 
Order AvionicsN/A1/24/22ASAP
Proton 2x, Batteries etc. see BOM
Order & finalize parachute, eyebolts, shockcord.N/A1/28/223/5/22
Structures team needs to figure out the parachute size needed and find a best fit for the rocket.
Solder Protons and Transmitter boardVery carefully solder connections to boards1/28/223/5/22
BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!.....
Glue Black Powder ChargesGlue in position to successfully deploy parachute1/28/22End of Av Bay manufacturing

Wire avionics bayConnect batteries, switches, pwm board, DC motor, and set up wires for black powder charges.1/28/22End of Av Bay Manufacturing

Do not directly connect source and ground. You will have a bad time.

Decide on how we are going to secure everything within the av bay.

Drill holes for Switches(Potentially) Create jig for alignment.1/28/22After wiring/installation of parts

Order electronic parts for Air brakesGet PWM module, DC Motor, Battery, flyback diode.1/28/22ASAP

Install Motor next to airbrakesAlign correctly.1/28/22End of Av Bay Manufacturing

Finalize materials needed for air breakFinalize parts list and stock. Put needed things in BOM1/28/22ASAP

Order materials for air breakN/A1/28/22ASAP
Highlight the items
Manufacture air break N/A1/28/223/20/22
Airbrake group is on this
Manufacture Thrust PlateN/A1/28/223/20/22
Structures on this
Cut and Glue Fins N/A1/28/223/20/22
Structures on this
Make and wire up black powder chargesWe need to first determine the materials we need to make this.1/28/22Before we close up the rocket
We should find someone who knows how to do this. 
Build Camera stabilizing system Produce parts and assembly 1/28/223/5/22
Camera group
Make parts for engineering camera systemPrint/cut1/28/223/5/22
Camera group
Wire up camera systems N/A1/28/223/20/22
Camera group with help of avionics if needed
Get switch for avionics systemWe also need to install it .1/28/223/5/22
What switch is being used? 
Have Fun idk -∞