Semester 2
Important Dates:
March 6-13 Spring Break
April 27 Final Exams Start
Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: |
---|---|---|---|---|---|
Assign tasks to people/groups. | 1/28/22 | Ongoing | Ongoing | We need to get groups working on specific action items. | |
Avionics Bay Sled | Determine materials, 3D print/laser cut | 1/24/22 | 3/5/22 | Avionics group should finalize details and CAD soon. | |
Finalize Motor for Air brakes | N/A | 1/24/22 | 1/31/22 | 1/28/22 | Use motor in BOM assuming airbrakes is still okay with it. |
Order Avionics | N/A | 1/24/22 | ASAP | Proton 2x, Batteries etc. see BOM | |
Order & finalize parachute, eyebolts, shockcord. | N/A | 1/28/22 | 3/5/22 | Structures team needs to figure out the parachute size needed and find a best fit for the rocket. | |
Solder Protons and Transmitter board | Very carefully solder connections to boards | 1/28/22 | 3/5/22 | BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... | |
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing | ||
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing | Do not directly connect source and ground. You will have a bad time. Decide on how we are going to secure everything within the av bay. | |
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts | ||
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 | ASAP | ||
Install Motor next to airbrakes | Align correctly. | 1/28/22 | End of Av Bay Manufacturing | ||
Finalize materials needed for air break | Finalize parts list and stock. Put needed things in BOM | 1/28/22 | ASAP | ||
Order materials for air break | N/A | 1/28/22 | ASAP | Highlight the items | |
Manufacture air break | N/A | 1/28/22 | 3/20/22 | Airbrake group is on this | |
Manufacture Thrust Plate | N/A | 1/28/22 | 3/20/22 | Structures on this | |
Cut and Glue Fins | N/A | 1/28/22 | 3/20/22 | Structures on this | |
Make and wire up black powder charges | We need to first determine the materials we need to make this. | 1/28/22 | Before we close up the rocket | We should find someone who knows how to do this. | |
Build Camera stabilizing system | Produce parts and assembly | 1/28/22 | 3/5/22 | Camera group | |
Make parts for engineering camera system | Print/cut | 1/28/22 | 3/5/22 | Camera group | |
Wire up camera systems | N/A | 1/28/22 | 3/20/22 | Camera group with help of avionics if needed | |
Get switch for avionics system | We also need to install it . | 1/28/22 | 3/5/22 | What switch is being used? | |
Have Fun | idk | -∞ | ∞ | ∞ |