Skip to end of metadata
Go to start of metadata
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 46
Next »
Subteam | Action Items | Further Action Items |
---|
Structures | - Finish nose cone
- drill holes
- need jig for payload
- vent holes in parachute bay
- shear pins
- vent holes in av bay
- screw holes for couplers
- fix tip
- keying tabs
- stability analysis
| - Drill payload holes
- drill vent holes
- drill screw holes
- drill shear pin holes
- prime nose cone
- reweigh EVERYthing
-
|
Avionics | - get new connectors for BRB battery
- make connectors
- make wiring harness
- vacuum test avionics
- cut av bay
- route delrin end caps
- laser support bars
- test brackets for batteries and connect
- print screw switch brackets
- print backplane battery bracker
- integration guide
- order tamiya
- Get FRS radio
| - Recut COTS sled
- Cut key
- Design and print PROMPT mount
- Vacuum test
- Design and print d-sub bracket
- Set pinout
- Bridge breakouts
|
Backplane | - fix radio module
- order power module
- putting altimeter in place of backplane
- need weight for test launch
- flying the battery for backplane
- Testing RFM range at test launch
| - RFM code
- Design and cut small altimeter sled
- waiting for parts
- dead mass for test flight
|
Payload | - Av bay
- BRB needs standoffs and mount
- Print SABOT
- print FC mount and add heat inserts
- print battery mount and mount x2
- print scrap mount and mount
- make dummy scrap with ultralogger -Jim
- 3D print screw switch mount
- tap support bar
- 3D print antenna clips
- reduce weight in chute bay
- Assemble and wire COTS Av -Louis
- Write procedures
| - Print sabot
- reprint scrap mount
- hole jig
- integrate new BRB battery
- make new mount
- Reintegrate other battery
- integration procedures
|
Recovery | - Deployment testing Thursday night
- Assemble recovery harness
- test remaining TD-2s
- Main parachute bag test
- how easy does it stay in there?
- how easy does it pull out
- Write and PRACTICE integration procedures
- Figure out stringing
-
| - Deployment testing
- finish procedures
|
Poster |
|
|
Other |
| - continue writing analysis section of TR
|
|
|
|