Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 55 Next »

SubteamAction ItemsFurther Action Items
Structures
  • Finish nose cone
    • bondo
    • sand
    • poly
  • drill holes
    • need jig for payload
    • vent holes in parachute bay
    • shear pins
    • vent holes in av bay
    • screw holes for couplers
  • fix tip
  • keying tabs
  • stability analysis
  • Drill payload holes
  • drill vent holes
  • drill screw holes
  • drill shear pin holes
  • prime nose cone
  • reweigh EVERYthing
  • (smile) 
Avionics
  • get new connectors for BRB battery
  • make connectors
  • make wiring harness
  • vacuum test avionics
  • cut av bay
    • route delrin end caps
    • laser support bars
    • test brackets for batteries and connect
    • print screw switch brackets 
    • print backplane battery bracker
    • integration guide
  • order tamiya
  • Get FRS radio
  • Recut COTS sled
  • Cut key
  • Design and print PROMPT mount
  • Vacuum test
  • Design and print d-sub bracket
  • Set pinout
  • Bridge breakouts
Backplane
  • fix radio module
  • order power module
  • putting altimeter in place of backplane
  • need weight for test launch 
  • flying the battery for backplane
  • Testing RFM range at test launch 
  • RFM code
  • Design and cut small altimeter sled
  • waiting for parts
  • dead mass for test flight
Payload
  • Av bay
    • BRB needs standoffs and mount
    • Print SABOT
    • print FC mount and add heat inserts
    • print battery mount and mount x2
    • print scrap mount and mount
    • make dummy scrap with ultralogger -Jim
    • 3D print screw switch mount
    • tap support bar
    • 3D print antenna clips
    • reduce weight in chute bay
    • Assemble and wire COTS Av -Louis
    • Write procedures
  • Print sabot
  • reprint scrap mount
  • hole jig
  • integrate new BRB battery 
    • make new mount
    • Reintegrate other battery
  • integration procedures
Recovery
  • Deployment testing Thursday night 
  • Assemble recovery harness
  • test remaining TD-2s
  • Main parachute bag test
    • how easy does it stay in there?
    • how easy does it pull out
  • Write and PRACTICE integration procedures 
  • Figure out stringing 
  •  
  • Deployment testing
  • finish procedures
Poster

Other 
  • continue writing analysis section of TR



  • No labels