Skip to end of metadata
Go to start of metadata
Date
Attendees
Goals
- Solidify sub-team leads and responsible individuals
Discussion items
Time | Item | Who | Notes |
---|
20 | DRI Designation Confirmation | | - Payload: Billy Billy
- Flight Computers
- Recovery
- Sabot
- Tracking
- Cameras
- Camera Transmission
- Ground Receiving
- Avionics: Will
- Structure / CAD model
- Custom flight hardware
- Custom flight software
- COTS recovery/flight computers
- Tracking
- Wiring/assembly
- Tracking testing
- Launch procedures
- Altimeter Vent Holes
- Reaction wheel
- Rocket Assembly: Mike Elrod
- Assemble final rocket CAD model
- Structural integration
- Renders/animations/visuals
- Simulation
- CAD models of every subcomponent
- Engineering drawings of every subcomponent
- Recovery: Sue
- Parachute sizing calculations
- Black powder calculations
- Recovery testing
- Snatch force calculations
- Charge cap manufacturing
- Sabot integration
- Shock cord calculations/assembly
- Recovery hardware selection
- Recovery assembly (chute packing)
- Smoke system assembly, test, integration
- Nose cone/Upper Airframe:
- Nose cone
- Main bay
- Metal tip
- Stability weights
- Booster: Mike
- Fin flutter calculation
- Fin geometry
- Fin can
- Thrust plate
- Design Concepts/Fundamentals: James May
- OpenRocket management
- Flight sims
- TWR
- Stability
- Umbilical: Grace
- Propulsion: Austin
- SRAD motor
- Safety protocol
- COTS equivalent
- ESRA/HeroX Compliance: Nate Aquilio
- Registration
- Design documents
- Any competition necessary paperwork
|
| | | |
Action items