Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 58 Next »

Please update these with more details of EVERYTHING that has to be done even the smallest thing add as a bullet to check off! Assign tasks and DRI's. The DRI's are responsible for completion not all of the hands-on work that comes from the team as a whole. 


Structures

Nose Cone

TaskAssigned Comments/Progress/Blockers
  • CAD
  • Identify each component and confirm their accuracy 
  • Add material properties
  • CAD
  • Model the polycarbonate
  • Ensure everything fits together
  • Order
  • Nose cone already ordered?
  • Assemble (epoxy to bulkhead)

What is the progress of this bulkhead it is attached to?

Airframe

TaskAssigned Comments/Progress/Blockers
  • CAD
Nathan Lloyd
  • CAD
Nathan LloydBlue Tube Lengths 
  • Order

  • Cut

Bulkheads x 5 Aluminum

TaskAssigned Comments/Progress/Blockers
  • CAD
  • Camera bay
  • Parachute
  • 3 air brakes 
  • FEA

  • Order/find stock (plywood)
Nate Lloyd (RIT Student) plywood is done at the moment, aluminium needs to be finished in CAD
  • Manufacture (router)


  • Assemble/ Epoxy to tube


Chute Bulkhead

TaskAssigned Comments/Progress/Blockers
  • CAD
just need the eye bolt holes, and need to pick an eye bolt.
  • FEA of Bulkhead

  • FEA of Ibolts

checking McMaster-carr

the one in fusion is probably too small and should be upped to maybe 1/2" diameter

  • Order/find stock (1/2 aluminum)
Thickness of 1/2 over kill? answer it is it has been reduced in the cad
  • Manufacture (CAM)


  • Manufacture (tormach)


  • Assemble/ Epoxy to tube


Camera Bulkhead

TaskAssigned Comments/Progress/Blockers
  • CAD

  • FEA of Bulkhead

  • Order/find stock (1/2 aluminum)
Thickness of 1/2 over kill?
  • Manufacture (CAM)

  • Manufacture (tormach)

  • Mount Camera to bulkhead

  • Assemble/ Epoxy to tube

Fins

TaskAssigned Comments/Progress/Blockers
  • CAD


  • Calcs (fin flutter) 
Louis Fleisher (RIT Student) double check these calcs
  • Order/find stock (Fiber Glass)
Get quote from Send cut send instead of make in house
  • Manufacture (CAM)
Nate Lloyd (RIT Student) Send cut send instead of make in house
  • Manufacture (crushinator or router)
Nate Lloyd (RIT Student) making in house
  • Manufacture slots in airframe tube


  • Jig to make slots in airframe 


  • Epoxy fins into slots


Motor (thrust plate/motor retainer/motor tube)

TaskAssigned Comments/Progress/Blockers
  • CAD
  • Put into Assembly
Nate Lloyd (RIT Student) 
  • Calcs 
  • FEA on PLates
Nate Lloyd (RIT Student) 
  • Order/find stock (Aluminum) 
  • Stock
  • Hardware
  • motor
Nate Lloyd (RIT Student) 
  • Manufacture 
  • Thrust plate 
  • Motor retainer
  • Motor tube
  • Find Motor Tube Weight 
Nate Lloyd (RIT Student) Get Motor Tube Weight
  • Assembly
  • Bolt together
  • Order TBD
Nate Lloyd (RIT Student) 

Airbrakes

TaskAssigned Comments/Progress/Blockers
  • CAD/Assembly 
  • Pick L brakets and order/test

  • FEA of ASSy

  • FEA of joints

  • Motor Selection from Calcs

  • Snatch force calculation

  • Airbrake equivalent of chute math

  • Order/Find Materials
  • BOM
Ready to order L brackets (x10)
  • Manufacture
  • Stock
  • Rods/long screw
  • Aluminum
  • Blue tube
  • Hardware


  • Assemble
  • Integreate with Rocket
  • Internal assembly
  • Add action items as CAD is finished


Engineering Camera

TaskAssigned Comments/Progress/Blockers
  • CAD/integrate with Rocket assembly

  • Order 
  • Camera
  • Electronics
  • ect from BOM
Remember to order press fittings
  • Manufacture
  • Cut slots in airframe
  • Cut slots in acrylic coupler
  • 3D print Jig
  • Hole in air frame for screw switch
  • 3D print casing 
  •  

3D print the mounts before cutting the tube to ensure fit

  • Assemble
  • Integrate with Rods
  • Epoxy to airframe
  • Wire/connect 

Scenic Camera

TaskAssigned Comments/Progress/Blockers
  • CAD/integrate with Rocket assembly
  • Bolt to make camera removable idea

  • Order 
  • Camera
  • Electronics
  • ect from BOM

  • Manufacture
  • Lathe acrylic tube 
  • Aluminum stock?
  • Steel Stock?

Add what has to happen to be manufactured don't have in notes


Acrylic coupler should be 4 inches on each side

  • Assemble
  • Bolts 
  • Integration to airframe TBD

Avionics

TaskAssigned Comments/Progress/Blockers
  • CAD/integrate with Rocket assembly
  • Component selection
  • Wire diagram
  • New wire diagram for the Arduino
    • Meet with avionics to discuss feasibility 
Avionics has approved plans to use Arduino. Finish AV bay(battery clips, boards, batteries). CAD DC Motor and motor retainer. Need to figure out how motor integrates with air break. 
  • Print 3D components

  • Figure out how to program the Arduino to accept PWM, and repeat the signal
    • Detecting PWM
    • Outputting PWM
    • Running timed loop for PWM output
  • Testing and Validation
Aaron Chan (RIT Student) Test full airbrake deployment as well as black powder charge triggering. 
  • Order 
  • boards(proton & arduino)
  • motor
  • gps
  • Explore other options
    • Reach out to Eggtimer for update on boards (2/18)

New wiring diagram approved. Check is everything ordered, even protons. 

  • Manufacture
  • Laser cut plywood (1/8th)
  • Set screw in square rod hole

  • Assemble
  • Glue together
  • slide into rocket

  • No labels