Construction:
- Bulkhead located on top of av bay
- Entire av bay can be pulled out in one piece
- Need wiring passthroughs for deployments
Order From Nosecone to Tail:
- Camera
- Switches (RBF)
- Sled
- SPICA board
- 900 MHz antenna, GPS Patch antenna
- RCC3 COTS Altimeter
- Big Red Bee BeeLine GPS
- Eggtimer
- Camera battery
- SPICA board
Top-Down assembly:
Top Bulkhead
- Permanently fixed
- Secured with rocket epoxy
- Threaded rods go only halfway through bulkhead and are able to be pulled out
- Panel mount connected w/ top of cameras for wires to pass through to charges
- Screws for alignment
Cameras
- Wires coiled in center
- more glue
- Threaded rods screwed into camera bulkhead
RBF
- Mount from top
- Threaded rods screwed into RBF bulkhead
Sled
- Riv-nuts ( ? )
- batteries all on one side
- power goes to switches, then down other side to flight computers
Bottom bulkhead
- removeable w/ square O-ring slot except the O-ring is a quattro
- 0.75" thick bulkhead
- LUBE
- LOTS AND LOTS OF LUBE
- screw holes on top of quattro ring
- one piece with eyebolt (4th axis baybeee!)
- Threaded rods run through, gets secured with nuts